# The Network Rail (Werrington Grade Separation) Order 2018, Part 1: STREETS TO BE STOPPED UP (FOR WHICH A SUBSTITUTE IS TO BE PROVIDED)


(1)
Area
(2)
Street to be stopped up
(3)
Extent of stopping up
(4)
New street to be substituted
City of Peterborough
Cock Lane Footpath
Between points P1A, P1, P2, P3 and P4
A footpath between points P1A, P1, P5, Work No. 3 and point P4
Existing stepped footway to A15 southbound
Between points P5 and P6
A footpath between points P5, P6, P7, P8, Work No. 6 and point P6

---
Source: https://www.legislation.gov.uk/uksi/2018/923/schedule/5/part/1 (the official version)
Page: https://openlegislation.uk/network-rail-werrington-grade-separation-order-2018/schedule-5/part-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.