# The Network Rail (West Coast Main Line) Order 2003, Article 6: Power to deviate


In constructing or maintaining any of the scheduled works, Network Rail may—
(a) deviate laterally from the lines or situations shown on the deposited plans within the limits of deviation for that work shown on those plans; and
(b) deviate vertically from the levels shown on the deposited sections—
(i) in the case of Work Nos. 1, 3, 4, 7, 8, 9, 13, 14, 16C, 23, 24, 25, 29, 30 and 31, to any extent not exceeding 0.75 metres upwards or downwards; and
(ii) in the case of any of the remaining works, to any extent not exceeding 3 metres upwards or downwards.

---