# The Network Rail (West Coast Main Line) Order 2003, Part I: LEVEL CROSSINGS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED


(1)
(2)
(3)
(4)
Area
Level crossing to be discontinued
Footpath to be stopped up
New footpath to be substituted
County of Staffordshire
Borough of Stafford
The level crossing at Burston Lodge
Footpath FP 35 between points F24, F18, F19, F20 and F21
Footpath between points F24, F25 and F22 (then along the D133 between points F22 and F21 being carried over the Colwich Junction to Cheadle Hulme Section by means of the existing bridge).
County of Cheshire
Borough of Congleton
The level crossing at Dunkirk Farm
Footpath FP 2 between points F9, F10, F11, F12, F13 and F14
(Along footpath FP 1 between points F9 and F15), footpath between points F15, F16, F17 and F14 to be carried under the Crewe to Manchester Section by means of the existing under bridge.
Metropolitan Borough of Stockport
The level crossing at Cheadle Hulme
Footpath FP 104 between points F1, F2 and F3
Footpath between points F1, F4, F5, F6, F7, F8 and F9 to be carried over the Colwich Junction to Cheadle Hulme Section by means of the existing bridge (then along footpath FP 97 between points F9 and F3).
County of Lancashire
Borough of Wyre
The level crossing at Woodacre
Footpath FP 107 between points F19 and F20
Footpath between points F19, F21, F22, F23 and F20 being carried over the Crewe to Glasgow Section by means of a new footbridge.
City of Lancaster
The level crossing at Galgate
Footpath FP 2 between points F1, F2, F3, F4, F5, F6 and F7 and footpath FP 15 between points F8 and F9
(Along Highland Brow between points F1 and F10), footpath between points F10, F11, F12, F13, F14 and F15 to be carried over the Crewe to Glasgow Section by means of a new footbridge, (then across Preston Lancaster Road A6 between points F15 and F16) and footpath between points F16 and F9.
County of Cumbria
District of South Lakeland
The level crossing at Well Heads
Footpath FP 532009 between points F8, F9 and F10
Footpath between points F8, F11, F12 and F10 to be carried beneath the Crewe to Glasgow Section by means of an existing underbridge.

---
Source: https://www.legislation.gov.uk/uksi/2003/1075/schedule/4/part/I (the official version)
Page: https://openlegislation.uk/network-rail-west-coast-main-line-order-2003/schedule-4/part-I
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.