# The Network Rail (West Coast Main Line) Order 2004, Schedule 4: REPLACEMENT OF FOOTPATH LEVEL CROSSINGS


LEVEL CROSSINGS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
(1)
(2)
(3)
(4)
Area
Level crossing to be discontinued
Footpath to be stopped up
New footpath to be substituted
County of Staffordshire
Borough of Tamworth
The level crossing at Alders
Footpath FP11 between points F13, F14 and F15
Footpath between points F13, F16 and F17 and between points F16 and F18/S3 to be carried under the West Coast Main Line railway by means of Work No. 6.
District of Lichfield
The level crossing at Comberford
Footpath FP22 between points C1 and C2
Footpath between points F4, F5, F6, F7, F8, F9 and C2 to be carried over the West Coast Main Line railway by means of Work No. 8.

---
Source: https://www.legislation.gov.uk/uksi/2004/389/schedule/4 (the official version)
Page: https://openlegislation.uk/network-rail-west-coast-main-line-order-2004/schedule-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

