# The Non-Road Mobile Machinery (Emission of Gaseous and Particulate Pollutants) Regulations 1999, Schedule 5: (ANNEX V to Directive 97/68/EC)


GASEOUS AND PARTICULATE SAMPLING SYSTEMS
Figure Number
Description
2
Exhaust gas analysis system for raw exhaust
3
Exhaust gas analysis system for dilute exhaust
4
Partial flow, isokinetic flow, suction blower control, fractional sampling
5
Partial flow, isokinetic flow, pressure blower control, fractional sampling
6
Partial flow, CO2 or NOsubx; control, fractional sampling
7
Partial flow, CO2 and carbon balance, total sampling
8
Partial flow, single venturi and concentration measurement, fractional sampling
9
Partial flow, twin venturi or orifice and concentration measurement, fractional sampling
10
Partial flow, multiple tube splitting and concentration measurement, fractional sampling
11
Partial flow, flow control, total sampling
12
Partial flow, flow control, fractional sampling
13
Full flow, positive displacement pump or critical flow venturi, fractional sampling
14
Particulate sampling system
15
Dilution system for full flow system

---
Source: https://www.legislation.gov.uk/uksi/1999/1053/schedule/5 (the official version)
Page: https://openlegislation.uk/non-road-mobile-machinery-emission-of-gaseous-and-particulate-pollutants-regulations-1999/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

