{
  "url": "https://openlegislation.uk/norfolk-boreas-offshore-wind-farm-order-2021/schedule-1/part-1",
  "json_url": "https://openlegislation.uk/norfolk-boreas-offshore-wind-farm-order-2021/schedule-1/part-1.json",
  "legislation": "uksi/2021/1414",
  "legislation_title": "The Norfolk Boreas Offshore Wind Farm Order 2021",
  "legislation_url": "https://openlegislation.uk/norfolk-boreas-offshore-wind-farm-order-2021",
  "path": "schedule/1/part/1",
  "kind": "part",
  "number": "1",
  "heading": "Authorised Development",
  "text": "Work No. 1\nin the event of scenario 1 and scenario 2:\n(a) an offshore wind turbine generating station with a gross electrical output of over 100 MW comprising up to 137 wind turbine generators each fixed to the seabed by one of the following foundation types: monopile (piled or suction caisson), jacket (piled or suction caisson), gravity base, or tetrabase fitted with rotating blades and situated within the area shown on the works plan and further comprising (b) to (e) below;\n(b) up to one offshore service platform fixed to the seabed within the area shown on the works plan by one of the following foundation types: jacket (piled or suction caisson) or gravity base;\n(c) up to two meteorological masts fixed to the seabed within the area shown on the works plan by one of the following foundation types: monopile (piled or suction caisson), jacket (piled or suction caisson) or gravity base;\n(d) up to two LIDAR measurement buoys fixed to the seabed within the area shown on the works plan by one of the following foundation types: monopile (piled) or floating, and up to two wave measurement buoys fixed to the seabed within the area shown on the works plan by one foundation type (floating); and\n(e) a network of subsea array cables and fibre optic cables within the area shown on the works plan between the wind turbine generators, and between the wind turbine generators and Work No.2 including one or more offshore cable crossings;\nin the event of scenario 1:\n(f) a network of subsea cables and fibre optic cables connecting wind turbine generators within (a) above to an offshore electrical platform within Norfolk Vanguard East including one or more offshore cable crossings.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 Pt. 1 substituted (21.9.2022) by The Norfolk Boreas Offshore Wind Farm (Amendment) Order 2022 (S.I. 2022/968), arts. 1, 3(a)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 1 Pt. 1 substituted (21.9.2022) by The Norfolk Boreas Offshore Wind Farm (Amendment) Order 2022 (S.I. 2022/968), arts. 1, 3(b)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2021/1414/schedule/1/part/1",
    "retrieved_at": "2026-10-28T22:05:57.745865+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}