The total length of the cables and the area and volume of their cable protection must not exceed the individual distributions set out in Table 2 of the outline scour protection and cable protection plan and must not exceed the following—
Work
Length
Cable protection (m3)
Cable protection (m2)
Work No. 1(e) and (f) (array)
600 kilometres
198,500 m3
389,000 m2

---