# The Norfolk Boreas Offshore Wind Farm Order 2021, Paragraph 2: Design parameters

Extent: E+W

The total length of the cables and the area and volume of their cable protection must not exceed the individual distributions set out in Table 2 of the outline scour protection and cable protection plan and must not exceed the following—
Work
Length
Cable protection (m3)
Cable protection (m2)
Work No. 3A (Interconnector link)
90 kilometres
17,000 m3
34,000 m2
Work No. 4A and 4B (export cable)
500 kilometres
69,236m3
124,086m2

---
Source: https://www.legislation.gov.uk/uksi/2021/1414/schedule/11/part/4/paragraph/2 (the official version)
Page: https://openlegislation.uk/norfolk-boreas-offshore-wind-farm-order-2021/schedule-11/part-4/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.