The total length of cables and volume of cable protection must not exceed the individual distributions set out in Table 2 of the outline scour protection and cable protection plan and must not exceed the following—
Work
Length
Cable protection (m3)
Cable protection (m2)
Work No. 3B (Project interconnection)
180 kilometres
41,000 m3
74,000 m2

---