{
  "url": "https://openlegislation.uk/norfolk-offshore-wind-farm-order-2003/schedule-1/paragraph-1",
  "json_url": "https://openlegislation.uk/norfolk-offshore-wind-farm-order-2003/schedule-1/paragraph-1.json",
  "legislation": "uksi/2003/2830",
  "legislation_title": "The Norfolk Offshore Wind Farm Order 2003",
  "legislation_url": "https://openlegislation.uk/norfolk-offshore-wind-farm-order-2003",
  "path": "schedule/1/paragraph/1",
  "kind": "paragraph",
  "number": "1",
  "heading": null,
  "text": "The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works on the bed of the North Sea adjoining the coast at Overstrand near Cromer in the district of North Norfolk, county of Norfolk:\n(a) Up to 30 wind turbines fixed to the seabed by tripod foundations and extending to a height of up to 137.8 metres above the level of high water, fitted with rotating blades with a diameter of up to 110 metres and situated at the following locations:\nWind turbine number\nLatitude North\nLongitude East\nA 1\n52° 58.655−\n01° 22.193−\nA 2\n52° 59.013−\n01° 22.111−\nA 3\n52° 59.371−\n01° 22.029−\nA 4\n52° 59.728−\n01° 21.947−\nA 5\n53° 00.086−\n01° 21.865−\nA 6\n53° 00.444−\n01° 21.783−\nA 7\n53° 00.802−\n01° 21.701−\nA 8\n53° 01.160−\n01° 21.619−\nA 9\n53° 01.517−\n01° 21.537−\nA 10\n53° 01.875−\n01° 21.455−\nB 1\n52° 58.707−\n01° 22.808−\nB 2\n52° 59.064−\n01° 22.726−\nB 3\n52° 59.422−\n01° 22.645−\nB 4\n52° 59.780−\n01° 22.563−\nB 5\n53° 00.138−\n01° 22.481−\nB 6\n53° 00.496−\n01° 22.399−\nB 7\n53° 00.853−\n01° 22.317−\nB 8\n53° 01.211−\n01° 22.235−\nB 9\n53° 01.569−\n01° 22.153−\nB 10\n53° 01.927−\n01° 22.071−\nC 1\n52° 58.758−\n01° 23.424−\nC 2\n52° 59.116−\n01° 23.342−\nC 3\n52° 59.474−\n01° 23.260−\nC 4\n52° 59.831−\n01° 23.178−\nC 5\n53° 00.189−\n01° 23.097−\nC 6\n53° 00.547−\n01° 23.015−\nC 7\n53° 00.905−\n01° 22.933−\nC 8\n53° 01.263−\n01° 22.851−\nC 9\n53° 01.620−\n01° 22.769−\nC 10\n53° 01.978−\n01° 22.687−\n(b) a network of cables buried under the seabed, connecting the wind turbines to each other;\n(c) up to three marine feeder cables buried under the seabed connecting the wind turbines to the shore commencing by a connection with wind turbine number A1 and then proceeding in a southerly direction for 6811 metres until they reach a point beneath the level of high water.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2003/2830/schedule/1/paragraph/1",
    "retrieved_at": "2026-10-29T05:45:40.677629+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}