  "url": "https://openlegislation.uk/norfolk-vanguard-offshore-wind-farm-order-2022/schedule-1/part-1",
  "json_url": "https://openlegislation.uk/norfolk-vanguard-offshore-wind-farm-order-2022/schedule-1/part-1.json",
  "legislation": "uksi/2022/138",
  "legislation_title": "The Norfolk Vanguard Offshore Wind Farm Order 2022",
  "legislation_url": "https://openlegislation.uk/norfolk-vanguard-offshore-wind-farm-order-2022",
  "path": "schedule/1/part/1",
  "kind": "part",
  "number": "1",
  "heading": "Authorised Development",
  "text": "Work No. 1\n(a) an offshore wind turbine generating station with a gross electrical output of over 100 MW comprising up to 145 wind turbine generators each fixed to the seabed by one of the following foundation types: monopile (piled or suction caisson), jacket (piled or suction caisson), or gravity base fitted with rotating blades and situated within the area shown on the works plan and further comprising (b) to (e) below;\n(b) up to two accommodation platforms fixed to the seabed within the area shown on the works plan by one of the following foundation types: jacket (piled or suction caisson) or gravity base;\n(c) up to two meteorological masts fixed to the seabed within the area shown on the works plan by one of the following foundation types: monopile (piled or suction caisson), jacket (piled or suction caisson) or gravity base;\n(d) up to two LIDAR measurement buoys fixed to the seabed within the area shown on the works plan by one of the following foundation types: monopile (piled) or floating, and up to two wave measurement buoys fixed to the seabed within the area shown on the works plan by one foundation type (floating); and\n(e) a network of subsea array cables and fibre optic cables within the area shown on the works plan between the wind turbine generators, and between the wind turbine generators and Work No.2 including one or more offshore cable crossings;\nand associated development within the meaning of section 115(2) (development for which development consent may be granted) of the 2008 Act comprising—\nWork No. 2 – up to two offshore electrical platforms fixed to the seabed within the area shown on the works plan by one of the following foundation types: jacket (piled or suction caisson) or gravity base;\nWork No. 3 – a network of subsea cables and fibre optic cables within the area shown on the works plans comprising Work No. 2 for the transmission of electricity and electronic communications between the offshore electrical platforms and including one or more offshore cable crossings;\nWork No. 4A – up to four subsea export cables and fibre optic cables between Work No. 2 and Work No. 4B consisting of subsea cables and fibre optic cables along routes within the Order limits seaward of MLWS including one or more offshore cable crossings;",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 Pt. 1 substituted (29.9.2022) by The Norfolk Vanguard Offshore Wind Farm (Amendment) Order 2022 (S.I. 2022/1004), arts. 1, 3(a)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 1 Pt. 1 substituted (29.9.2022) by The Norfolk Vanguard Offshore Wind Farm (Amendment) Order 2022 (S.I. 2022/1004), arts. 1, 3(b)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/138/schedule/1/part/1",
    "retrieved_at": "2026-10-28T22:04:05.962869+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}