  "url": "https://openlegislation.uk/norfolk-vanguard-offshore-wind-farm-order-2022/schedule-12/part-4/paragraph-3",
  "json_url": "https://openlegislation.uk/norfolk-vanguard-offshore-wind-farm-order-2022/schedule-12/part-4/paragraph-3.json",
  "legislation": "uksi/2022/138",
  "legislation_title": "The Norfolk Vanguard Offshore Wind Farm Order 2022",
  "legislation_url": "https://openlegislation.uk/norfolk-vanguard-offshore-wind-farm-order-2022",
  "path": "schedule/12/part/4/paragraph/3",
  "kind": "paragraph",
  "number": "3",
  "heading": "Phasing of the authorised scheme",
  "text": "(1) Taken together with works authorised and proposed to be constructed pursuant to licence 1 (transmission)—\n(a) the total number of offshore electrical platforms forming part of the authorised scheme must not exceed two;\n(b) the total amount of scour protection for the offshore electrical platforms forming part of the authorised scheme must not exceed 20,000m2 and 100,000 m3; and\n(c) the total amount of inert material of natural origin disposed within the offshore Order limits as part of the authorised scheme must not exceed 11,475,000 m3;\n(d) the total amount of disposal for drill arisings in connection with any foundation drilling must not exceed 14,137 m3;\n(e) the total length of cable and the amount of cable protection must not exceed the figures stated in condition 2 of this licence; and\n(f) in the Haisborough, Hammond and Winterton Special Area of Conservation, the total area of cable protection must not exceed 32,000m² and the total volume of cable protection must not exceed 20,800m³.\n(2) Prior to the commencement of the authorised scheme the undertaker must give notice to the MMO detailing—\n(a) whether the authorised scheme will be constructed—\n(i) in a single offshore phase under this licence; or\n(ii) in two offshore phases under this licence and licence 1 (transmission); and\n(b) where the authorised scheme will be constructed in two offshore phases, the total number of offshore electrical platforms to be constructed in each phase.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 12 Pt. 4 para. 3 in force at 5.3.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/138/schedule/12/part/4/paragraph/3",
    "retrieved_at": "2026-10-28T22:04:05.962869+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}