# The Norfolk Vanguard Offshore Wind Farm Order 2022, Paragraph 3: Phasing of the authorised scheme

Extent: E+W+S

(1) Taken together with works authorised and proposed to be constructed pursuant to licence 1 (transmission)—
(a) the total number of offshore electrical platforms forming part of the authorised scheme must not exceed two;
(b) the total amount of scour protection for the offshore electrical platforms forming part of the authorised scheme must not exceed 20,000m2 and 100,000 m3; and
(c) the total amount of inert material of natural origin disposed within the offshore Order limits as part of the authorised scheme must not exceed 11,475,000 m3;
(d) the total amount of disposal for drill arisings in connection with any foundation drilling must not exceed 14,137 m3;
(e) the total length of cable and the amount of cable protection must not exceed the figures stated in condition 2 of this licence; and
(f) in the Haisborough, Hammond and Winterton Special Area of Conservation, the total area of cable protection must not exceed 32,000m² and the total volume of cable protection must not exceed 20,800m³.
(2) Prior to the commencement of the authorised scheme the undertaker must give notice to the MMO detailing—
(a) whether the authorised scheme will be constructed—
(i) in a single offshore phase under this licence; or
(ii) in two offshore phases under this licence and licence 1 (transmission); and
(b) where the authorised scheme will be constructed in two offshore phases, the total number of offshore electrical platforms to be constructed in each phase.

---
Source: https://www.legislation.gov.uk/uksi/2022/138/schedule/12/part/4/paragraph/3 (the official version)