# The North Falls Offshore Wind Farm Order 2026, Paragraph 196: Approvals


(1) The undertaker will obtain the approval in writing of London Gateway of each of the relevant plans (in so far as those plans relate to any area or areas of the authorised development which are within the limits of deviation for dredging of London Gateway as defined by the London Gateway HEO) before any application for approval of those plans is submitted by the undertaker in compliance with condition 22 of the deemed marine licence for the transmission assets in Schedule 9 (deemed marine licence under the 2009 Act – transmission assets).
(2) The draft cable specification and installation plan referred to in sub-paragraph (1) must be in accordance with requirement 2(3) and set out for Work No. 3—
(a) the proposed cable burial depth(s);
(b) the proposed cable burial methods;
(c) any cable protection proposed including type, volume and anticipated locations;
(d) the proposed programme of work for cable burial; and
(e) details of how any impacts on shipping to and from London Gateway Port will be minimised so far as reasonably practicable during the carrying out of the works covered by the draft cable specification and installation plan.

---
Source: https://www.legislation.gov.uk/uksi/2026/567/schedule/14/paragraph/196 (the official version)
Page: https://openlegislation.uk/north-falls-offshore-wind-farm-order-2026/schedule-14/paragraph-196
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.