# The North Falls Offshore Wind Farm Order 2026, Paragraph 199: Provision of as built details


As soon as reasonably practicable following the completion of the installation of cables forming Work No. 3, and after any maintenance of the same pursuant to condition 13 of the deemed marine licence for transmission assets in Schedule 9 (deemed marine licence under the 2009 Act – transmission assets), the undertaker must provide (on a strictly confidential basis) to London Gateway as built drawings of Work No. 3 in a form and scale to be agreed between the undertaker and London Gateway to show the position, depth and any cable protection installed as part of Work No. 3 in relation to the Areas of Interest provided that London Gateway must not disclose (without the written consent of the undertaker) any information that has been provided by the undertaker to London Gateway on a confidential basis or which is marked as commercially sensitive and must hold such information on a confidential basis only, except that London Gateway may provide the information to contractors and agents acting on its behalf (including but not limited to contractors engaged to carry out dredging operations) provided that such agents and contractors are required by London Gateway to treat such information as confidential.

---
Source: https://www.legislation.gov.uk/uksi/2026/567/schedule/14/paragraph/199 (the official version)
Page: https://openlegislation.uk/north-falls-offshore-wind-farm-order-2026/schedule-14/paragraph-199
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.