# The North Falls Offshore Wind Farm Order 2026, Paragraph 2: Details of licensed marine activities


Subject to the licence conditions in Part 2, this licence authorises the undertaker (and any agent or contractor acting on its behalf) to carry out the following licensable marine activities under section 66(1) (licensable marine activities) of the 2009 Act—
(a) the deposit at sea, at disposal site reference provided by the MMO, within the Order limits seaward of MHWS of the substances and articles specified in paragraph 4 below and within Work No. 1 of up to 22,408,883 cubic metres (being a maximum, not an approximate upper figure) of inert material of natural origin produced during construction drilling or seabed preparation for foundation works and seabed preparation for cable installation and cable installation (whether by ploughing, jetting, trenching or a combination of installation techniques);
(b) the construction of works in or over the sea and/or on or under the seabed;
(c) dredging for the purposes of seabed preparation for foundation works, preparation for construction vessels and/or electrical circuit works;
(d) the removal of sediment samples for the purposes of informing environmental monitoring under this licence during pre-construction, construction and operation;
(e) boulder clearance works by displacement ploughing or subsea grab technique or any other comparable method;
(f) removal of static fishing equipment;
(g) wet storage; and
(h) site preparation works.

---
Source: https://www.legislation.gov.uk/uksi/2026/567/schedule/8/paragraph/2 (the official version)
Page: https://openlegislation.uk/north-falls-offshore-wind-farm-order-2026/schedule-8/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.