# The North Falls Offshore Wind Farm Order 2026, Paragraph 12: Design parameters


The total length of the cable circuits in Work Nos. 2, 3 and 4A, and the area and volume of their cable protection (including cable crossings) must not exceed the following—
(1)
Work No.
(2)
Parameter
(3)
Value
Work No. 2
Maximum total length
20 km
Maximum protection area
24,000 m2
Maximum protection volume
14,000 m3
Work Nos. 3 and 4A
Maximum total length
125.4 km
Maximum protection area
75,240 m2
Maximum protection volume
43,890 m3

---