# The North Killingholme (Generating Station) (Amendment) Order 2026

S.I. 2026/445 · made 2 April 2026

This Order amends the North Killingholme (Generating Station) Order 2014 (the “the 2014 Order”), a development consent order under the Planning Act 2008, following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material amendment under paragraph 2 of Schedule 6 to the Planning Act 2008. This Order amends the 2014 Order to provide for an alternative designated site for the delivery carbon capture and storage technology; to make amendments to the maximum generating capacity of the generating station and to make minor changes to the building height parameters comprising Work No. 1.

Made under: Planning Act 2008 (Schedule 6 paragraph 2)

PDFs: Printed copy https://openlegislation.uk/north-killingholme-generating-station-amendment-order-2026/pdf/uksi_20260445_en.pdf

## Introductory text

Infrastructure Planning
Made 2nd April 2026
Coming into force 3rd April 2026
An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008, to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 (“the 2011 Regulations”) for non-material changes to the North Killingholme (Generating Station) Order 2014.
The Secretary of State, having considered the application, the responses to the publicity and consultation required by regulations 6 and of the 2011 Regulations, has decided to make the changes on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
Accordingly, the Secretary of State, in exercise of the powers conferred by paragraphs 2(1) and (9) of Schedule 6 to the Planning Act 2008, makes the following Order.

## 1 Citation and commencement

This Order may be cited as the North Killingholme (Generating Station) (Amendment) Order 2026 and comes into force on 3rd April 2026.

## 2 Amendment to the 2014 Order

The North Killingholme (Generating Station) Order 2014 is amended as follows.

## 3 Amendment to Article 2(1) (Interpretation)

In article 2(1), in the definition of “the works plans”, after “in accordance with article 34A(1A)” insert “, and as further supplemented by the works plan dated 16th July 2025 and certified by the Secretary of State in accordance with article 34(1B)”.

## 4 Amendments to Article 34 (Certification of plans, etc.)

After paragraph (1A) insert—
“(1B) The undertaker shall, as soon as practicable after the coming into force of the North Killingholme (Generating Station) (Amendment) Order 2026, submit to the Secretary of State copies of—
(a) the works plan dated 16th July 2025 that was submitted with the application dated 31st July 2025 for a non-material change to this Order under paragraph 2 of Schedule 6 to the 2008 Act; and
(b) the feasibility study dated 21st July 2025 (North Killingholme (Generating Station) Order – Non-Material Change Application 2025 Carbon Capture Readiness Compliance),
for certification that they are true copies of the plans or documents referred to in this Order.”.

## 5 Amendments to Part 1 (Authorised development) of Schedule 1 (Authorised development)

(1) Part 1 (Authorised development) of Schedule 1 (Authorised development) is amended as follows.
(2) In the first paragraph, for “470 MWe” substitute “550 MWe”.
(3) In Work No. 1—
(a) after paragraph (n), omit “and”;
(b) after paragraph (o), for “;” substitute “; and”;
(c) after paragraph (o) insert—
“(p) an auxiliary boiler and associated stack;”.

## 6 Amendments to Part 2 (Building heights) of Schedule 1 (Authorised development)

In Part 2 (Building heights) of Schedule 1 (Authorised development), omit the table and substitute it with the following table—
(1)
(2)
Building
Height (metres) above ordnance datum
Heat recovery steam generator
47
Turbine hall
35
Main stack
85
Hybrid cooling tower (bank 1)
28
Hybrid cooling tower (bank 2)
28
Administration building
17
Warehouse
25
Water treatment plant
13
Break tank
22
Gas insulated switchgear building
17
Covered fuel storage
40
Biomass storage silos
50
Limestone storage silos
50
Gasifier, including fuel preparation facility
70
Air separation unit
50
Oxygen storage tank
25
Acid gas removal
65
Wastewater treatment plant
25
Electrical switching station 1
25
Electrical switching station 2
15
Electrical switching station 3
15
Flare stack
140
Auxiliary boiler and stack
15

## 7 Amendments to Part 3 (Requirements) of Schedule 1 (Authorised development)

(1) Part 3 (Requirements) of Schedule 1 (Authorised development) is amended as follows.
(2) In paragraph 1—
(a) in the definition of “designated site”, for ““Post Combustion CCS Area”” substitute “Land Reserved for carbon capture readiness compliance””;
(b) after the definition of “operations area” insert—
““overlap areas” means the areas of Work No. 1 shown cross hatched green on the works plans;”; and
(c) omit the definition of “post-combustion CCS proposal” and substitute—
““post-combustion CCS proposal” means the CCS proposal not including Work No. 2a set out in the feasibility study dated 21 July 2025 (North Killingholme (Generating Station) Order – Non-Material Change Application 2025 Carbon Capture Readiness Compliance) certified by the Secretary of State for the purposes of this Order;”.
(3) After paragraph 52, insert—
“Work No. 1
53. Work Nos. 1(a), 1(b), 1(c), 1(d), 1(e) and 1(p) must not be carried out within the overlap areas.”.

## Signature

Signed by authority of the Secretary of State for Energy Security and Net Zero
John Wheadon
Head of Energy Infrastructure Planning Delivery
Department for Energy Security and Net Zero
2nd April 2026

## Explanatory note

(This note is not part of the Order)
This Order amends the North Killingholme (Generating Station) Order 2014 (the “the 2014 Order”), a development consent order under the Planning Act 2008, following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material amendment under paragraph 2 of Schedule 6 to the Planning Act 2008. This Order amends the 2014 Order to provide for an alternative designated site for the delivery carbon capture and storage technology; to make amendments to the maximum generating capacity of the generating station and to make minor changes to the building height parameters comprising Work No. 1.

---
Source: https://www.legislation.gov.uk/uksi/2026/445 (the official version)
Page: https://openlegislation.uk/north-killingholme-generating-station-amendment-order-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.