# The North Killingholme (Generating Station) (Amendment) Order 2026, Article 6: Amendments to Part 2 (Building heights) of Schedule 1 (Authorised development)


In Part 2 (Building heights) of Schedule 1 (Authorised development), omit the table and substitute it with the following table—
(1)
(2)
Building
Height (metres) above ordnance datum
Heat recovery steam generator
47
Turbine hall
35
Main stack
85
Hybrid cooling tower (bank 1)
28
Hybrid cooling tower (bank 2)
28
Administration building
17
Warehouse
25
Water treatment plant
13
Break tank
22
Gas insulated switchgear building
17
Covered fuel storage
40
Biomass storage silos
50
Limestone storage silos
50
Gasifier, including fuel preparation facility
70
Air separation unit
50
Oxygen storage tank
25
Acid gas removal
65
Wastewater treatment plant
25
Electrical switching station 1
25
Electrical switching station 2
15
Electrical switching station 3
15
Flare stack
140
Auxiliary boiler and stack
15

---
Source: https://www.legislation.gov.uk/uksi/2026/445/article/6 (the official version)
Page: https://openlegislation.uk/north-killingholme-generating-station-amendment-order-2026/article-6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

