  "url": "https://openlegislation.uk/north-killingholme-generating-station-order-2014/article-3",
  "json_url": "https://openlegislation.uk/north-killingholme-generating-station-order-2014/article-3.json",
  "legislation": "uksi/2014/2434",
  "legislation_title": "The North Killingholme (Generating Station) Order 2014",
  "legislation_url": "https://openlegislation.uk/north-killingholme-generating-station-order-2014",
  "path": "article/3",
  "kind": "article",
  "number": "3",
  "heading": "Development consent etc. granted by the Order",
  "text": "(1) Subject to the provisions of this Order, the undertaker is granted development consent for the authorised development to be carried out within the Order limits, and Schedule 1 (authorised development) has effect for that purpose.\n(2) For the purposes of the authorised development, development consent granted by this Order shall include and permit the alteration, removal, clearance, refurbishment, reconstruction, decommissioning and demolition of any buildings or other structures within the Order limits to the extent that they relate to, are required by, or are incidental to the carrying out of the authorised development.\n(3) The development authorised by this Order shall be constructed in the lines or situations shown on the land plans and works plans.\n(4) The scheduled works shall be constructed within the limits of deviation.\n(5) In constructing the scheduled works, the undertaker may—\n(a) deviate laterally from the lines or situations shown on the works plans within the limits of deviation; and\n(b) deviate vertically to any extent downwards and (except in the case of maintaining) no more than 5 metres upwards from the heights specified in Part 2 of Schedule 1 for each building comprised in the authorised development and shown on the works plans as may be necessary, convenient or expedient.\n(6) The main stack comprised in Work No. 1 and shown on the works plans shall not be constructed so as to be lower than 85 metres above ordnance datum and the flare stack comprised in Work No. 2b shall not be constructed so as to be lower than 140 metres above ordnance datum.\n(7) The pipe conveyor comprised in Work No. 6b shall not be constructed above 21 metres above ordnance datum except in the locations shown on drawing 2.28 Conveyor Section in the works plans.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Art. 3 in force at 2.10.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/2434/article/3",
    "retrieved_at": "2026-10-29T00:03:01.712907+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}