  "url": "https://openlegislation.uk/north-lincolnshire-green-energy-park-order-2025/schedule-1/part-2",
  "json_url": "https://openlegislation.uk/north-lincolnshire-green-energy-park-order-2025/schedule-1/part-2.json",
  "legislation": "uksi/2025/362",
  "legislation_title": "The North Lincolnshire Green Energy Park Order 2025",
  "legislation_url": "https://openlegislation.uk/north-lincolnshire-green-energy-park-order-2025",
  "path": "schedule/1/part/2",
  "kind": "part",
  "number": "2",
  "heading": "PARAMETERS TABLE",
  "text": "(1)\nComponent\n(2)\nMaximum dimensions\n(m)\n(2)\nMaximum height above Finished Floor Level (FFL)\n(m)\n(2)\nMaximum height AOD\n(m)\nERF (Work No. 1)\nTipping hall\n87.5 x 60\n31\n37.6\nBunker hall\n92 x 40\n43\n49.6\nBoiler hall\n105 x 60\n55\n61.6\nFlue gas treatment hall\n41 x 60\n45\n51.6\nTurbine hall\n80 x 37\n25\n31.6\nBottom ash hall\n37 x 37\n25\n31.6\nTransformer compound\n52 x 22\n10\n16.6\nSwitchyard\n93 x 44\n10\n14.6\nOffices and admin facilities\n30 x 100\n43\n49.6\nFire water tank\n11.3 diameter\n19.3\n25.9\nFire water pumphouse\n6 x 6\n6.5\n13.1\nGatehouses\n32 x 12\n5\n11.6\nVisual barriers\n4.5\n11.1\nERF stack windshield (Work No. 1A)\n10 diameter\n120\n126.6\nBack up boilers stack windshield (Work No. 1A)\n3 diameter\n53\n59.6\nBack-up generator stack (Work No. 1A)\n0.85 diameter\n55\n61.6\nCarbon capture utilisation and storage facility (Work No. 1B)\n79 x 66\n50\n56.6\nCarbon dioxide storage tanks (Work No. 1B)\n28 x 20\n20\n26.6\nVisitor centre (Work No. 1C)\n41 x 36\n16\n19.05\nElevated walkway (Work No. 1 and 1C)\n700 x 4\n12\n17.05\nAir-cooled condensers/Air blast chillers (Work No. 1D)\n75 x 35\n50\n56.6\nRHTF and CBMF (Work No. 2)\nprocess building and storage areas\n280 x 130\n25\n30.1\nAdmin buildings\n62 x 10\n21\n26.1\nRail Infrastructure (Work No. 3)\nFootbridge No. 1\n55.385\nFootbridge No. 2\n48.561\nAccess road (Work No. 5)\n5.2\nPlastic recycling facility (Work No. 6)\nPre-processed material storage\n65 x 35\n10\n13.9\nHeat exchange building\n35 x 17\n15\n18.9\nPost processed storage\n5 x 16.4\n15\n18.9\nElectrical rooms\n15 x 7\n10\n13.9\nProcess building\n130 x 80\n25\n28.9\nAdmin building\n62 x 10\n21\n24.9\nHydrogen electrolyser (Work No. 7)\nNorthern Gas AGI\n60 x 60\n5\n9.6\nNorthern hydrogen production and storage facility\n100 x 25\n8\n12.6\nVehicle refuelling station\n(Work No. 8)\n95 x 80\n12.5\n15.5\nHydrogen refuelling station (Work No. 8)\nSouthern Gas AGI\n60 x 60\n5\n10.1\nSouthern hydrogen production and storage facility\n100 x 25\n8\n11.6\nBattery storage facility (Work No. 9)\n115 x 58\n8.5\n11.5",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 2 in force at 4.4.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/362/schedule/1/part/2",
    "retrieved_at": "2026-10-28T21:18:29.047048+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}