# The North Lincolnshire Green Energy Park Order 2025, Part 2: PARAMETERS TABLE

Extent: E+W+S

(1)
Component
(2)
Maximum dimensions
(m)
(2)
Maximum height above Finished Floor Level (FFL)
(m)
(2)
Maximum height AOD
(m)
ERF (Work No. 1)
Tipping hall
87.5 x 60
31
37.6
Bunker hall
92 x 40
43
49.6
Boiler hall
105 x 60
55
61.6
Flue gas treatment hall
41 x 60
45
51.6
Turbine hall
80 x 37
25
31.6
Bottom ash hall
37 x 37
25
31.6
Transformer compound
52 x 22
10
16.6
Switchyard
93 x 44
10
14.6
Offices and admin facilities
30 x 100
43
49.6
Fire water tank
11.3 diameter
19.3
25.9
Fire water pumphouse
6 x 6
6.5
13.1
Gatehouses
32 x 12
5
11.6
Visual barriers
4.5
11.1
ERF stack windshield (Work No. 1A)
10 diameter
120
126.6
Back up boilers stack windshield (Work No. 1A)
3 diameter
53
59.6
Back-up generator stack (Work No. 1A)
0.85 diameter
55
61.6
Carbon capture utilisation and storage facility (Work No. 1B)
79 x 66
50
56.6
Carbon dioxide storage tanks (Work No. 1B)
28 x 20
20
26.6
Visitor centre (Work No. 1C)
41 x 36
16
19.05
Elevated walkway (Work No. 1 and 1C)
700 x 4
12
17.05
Air-cooled condensers/Air blast chillers (Work No. 1D)
75 x 35
50
56.6
RHTF and CBMF (Work No. 2)
process building and storage areas
280 x 130
25
30.1
Admin buildings
62 x 10
21
26.1
Rail Infrastructure (Work No. 3)
Footbridge No. 1
55.385
Footbridge No. 2
48.561
Access road (Work No. 5)
5.2
Plastic recycling facility (Work No. 6)
Pre-processed material storage
65 x 35
10
13.9
Heat exchange building
35 x 17
15
18.9
Post processed storage
5 x 16.4
15
18.9
Electrical rooms
15 x 7
10
13.9
Process building
130 x 80
25
28.9
Admin building
62 x 10
21
24.9
Hydrogen electrolyser (Work No. 7)
Northern Gas AGI
60 x 60
5
9.6
Northern hydrogen production and storage facility
100 x 25
8
12.6
Vehicle refuelling station
(Work No. 8)
95 x 80
12.5
15.5
Hydrogen refuelling station (Work No. 8)
Southern Gas AGI
60 x 60
5
10.1
Southern hydrogen production and storage facility
100 x 25
8
11.6
Battery storage facility (Work No. 9)
115 x 58
8.5
11.5

---
Source: https://www.legislation.gov.uk/uksi/2025/362/schedule/1/part/2 (the official version)