{
  "url": "https://openlegislation.uk/north-lincolnshire-green-energy-park-order-2025/schedule-1/part-2/enacted",
  "json_url": "https://openlegislation.uk/north-lincolnshire-green-energy-park-order-2025/schedule-1/part-2/enacted.json",
  "legislation": "uksi/2025/362",
  "legislation_title": "The North Lincolnshire Green Energy Park Order 2025",
  "legislation_url": "https://openlegislation.uk/north-lincolnshire-green-energy-park-order-2025/enacted",
  "path": "schedule/1/part/2",
  "kind": "part",
  "number": "2",
  "heading": "PARAMETERS TABLE",
  "text": "(1)\nComponent\n(2)\nMaximum dimensions\n(m)\n(2)\nMaximum height above Finished Floor Level (FFL)\n(m)\n(2)\nMaximum height AOD\n(m)\nERF (Work No. 1)Tipping hall87.5 x 603137.6\nBunker hall92 x 404349.6\nBoiler hall105 x 605561.6\nFlue gas treatment hall41 x 604551.6\nTurbine hall80 x 372531.6\nBottom ash hall37 x 372531.6\nTransformer compound52 x 221016.6\nSwitchyard93 x 441014.6\nOffices and admin facilities30 x 1004349.6\nFire water tank11.3 diameter19.325.9\nFire water pumphouse6 x 66.513.1\nGatehouses32 x 12511.6\nVisual barriers4.511.1\nERF stack windshield (Work No. 1A)10 diameter120126.6\nBack up boilers stack windshield (Work No. 1A)3 diameter5359.6\nBack-up generator stack (Work No. 1A)0.85 diameter5561.6\nCarbon capture utilisation and storage facility (Work No. 1B)79 x 665056.6\nCarbon dioxide storage tanks (Work No. 1B)28 x 202026.6\nVisitor centre (Work No. 1C)41 x 361619.05\nElevated walkway (Work No. 1 and 1C)700 x 41217.05\nAir-cooled condensers/Air blast chillers (Work No. 1D)75 x 355056.6\nRHTF and CBMF (Work No. 2)process building and storage areas280 x 1302530.1\nAdmin buildings62 x 102126.1\nRail Infrastructure (Work No. 3)Footbridge No. 155.385\nFootbridge No. 248.561\nAccess road (Work No. 5)5.2\nPlastic recycling facility (Work No. 6)Pre-processed material storage65 x 351013.9\nHeat exchange building35 x 171518.9\nPost processed storage5 x 16.41518.9\nElectrical rooms15 x 71013.9\nProcess building130 x 802528.9\nAdmin building62 x 102124.9\nHydrogen electrolyser (Work No. 7)Northern Gas AGI60 x 6059.6\nNorthern hydrogen production and storage facility100 x 25812.6\nVehicle refuelling station\n(Work No. 8)\n95 x 8012.515.5\nHydrogen refuelling station (Work No. 8)Southern Gas AGI60 x 60510.1\nSouthern hydrogen production and storage facility100 x 25811.6\nBattery storage facility (Work No. 9)115 x 588.511.5",
  "extent": "E+W+S",
  "status": null,
  "version": "enacted",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/362/schedule/1/part/2",
    "retrieved_at": "2026-10-28T21:18:29.047048+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}