# The North London Heat and Power Generating Station (Amendment) Order 2018, Article 2: Amendment to the North London Heat and Power Generating Station Order 2017


(1) The North London Heat and Power Generating Station Order 2017 is amended as follows.
(2) In paragraph 1(1) of Schedule 1 (Authorised Development) before “megawatts”, for “70” substitute “78”.

---
Source: https://www.legislation.gov.uk/uksi/2018/882/article/2 (the official version)