# The North London Heat and Power Generating Station Order 2017, Article 14: Access to works

Extent: E+W+S

For the purposes of constructing the authorised development, the undertaker may—
(a) form and lay out means of access, or improve existing means of access, in the locations specified in Schedule 9 (access to works); and
(b) with the approval of the relevant planning authority after consultation with the highway authority, form and lay out such other means of access or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires.

---