  "url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017/schedule-2/paragraph-5",
  "json_url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017/schedule-2/paragraph-5.json",
  "legislation": "uksi/2017/215",
  "legislation_title": "The North London Heat and Power Generating Station Order 2017",
  "legislation_url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017",
  "path": "schedule/2/paragraph/5",
  "kind": "paragraph",
  "number": "5",
  "heading": "Parameters",
  "text": "The authorised development must be constructed within the following parameters—\n(1) Works No. 1a (Drawing C_0003 Rev 01 of the works plans)—\nDescription\nWorks No.\nLength (m)\nWidth (m)\nHeight (m)\nHeight (m AOD)\nTipping hall\nWorks No. 1a (a)(i)\n48\n74\n31.5\n+44.0 AOD\nWaste bunker and waste handling equipment\nWorks No. 1a (a)(ii)\n42.3\n85\n44.5\n+57.0 AOD\nTwo process lines consisting of a moving grate, furnace, boiler and flue gas treatment plant and steam turbines\nWorks No. 1a (a)(iii) and (v)\n130.7\n74\n56.5\n+69.0 AOD\nFacilities for the recovery of incinerator bottom ash and air pollution control residue\nWorks No. 1a (a)(iv)\nBelow ground only\nControl room containing operational and environmental control and monitoring systems and offices\nWorks No. 1a (a)(vi)\n65.6\n21\n44.5\n+57 AOD\nStack containing flues for flue gas exhaust\nWorks No. 1a (c)\n24\n12.5\n105\n+117.5 AOD\nCooling equipment\nWorks No. 1a (d)\n60\n24\n28.7\n+41.2 AOD\nObservation platform enclosure\nWorks No.1a (e)\n17\n13\n6 (above +44.0 AOD)\n+50 AOD\n(2) Works No. 1b (Drawing C_0002 Rev 01 of the works plans)—\nDescription\nWorks No.\nHeight (m)\nHeight (m AOD)\nWastewater treatment facility, water pre-treatment plant, external stores and workshops, fuelling area and fuel storage, vehicle wash, transport offices and staff facilities, toilets, natural gas intake and management compound, fire control water tanks and electrical substations\nWorks No. 1b\n18\n30.5\n(3) Works No. 2 (Drawing C_0005 Rev 01 of the works plans)—\nDescription\nWorks No.\nLength (m)\nWidth (m)\nHeight (m)\nHeight (m AOD)\nResource recovery facility\nWorks No. 2 (a), (b) and (c)\n127\n180\n20\n+30.5 AOD\nMaximum dimensions based on dimensions of enclosing rectangle oriented north-south.\n(4) Works No. 3 (Drawing C_0007 Rev 01 of the works plans)—\nDescription\nWorks No.\nLength (m)\nWidth (m)\nHeight (m)\nHeight (m AOD)\nVisitor, community and education facilities, office accommodation and boat canopy\nWorks No. 3\n41\n16.7\n14\n+24.6 AOD",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 5 in force at 18.3.2017, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2017/215/schedule/2/paragraph/5",
    "retrieved_at": "2026-10-28T23:14:36.077392+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}