# The North London Heat and Power Generating Station Order 2017, Paragraph 5: Parameters

Extent: E+W+S

The authorised development must be constructed within the following parameters—
(1) Works No. 1a (Drawing C_0003 Rev 01 of the works plans)—
Description
Works No.
Length (m)
Width (m)
Height (m)
Height (m AOD)
Tipping hall
Works No. 1a (a)(i)
48
74
31.5
+44.0 AOD
Waste bunker and waste handling equipment
Works No. 1a (a)(ii)
42.3
85
44.5
+57.0 AOD
Two process lines consisting of a moving grate, furnace, boiler and flue gas treatment plant and steam turbines
Works No. 1a (a)(iii) and (v)
130.7
74
56.5
+69.0 AOD
Facilities for the recovery of incinerator bottom ash and air pollution control residue
Works No. 1a (a)(iv)
Below ground only
Control room containing operational and environmental control and monitoring systems and offices
Works No. 1a (a)(vi)
65.6
21
44.5
+57 AOD
Stack containing flues for flue gas exhaust
Works No. 1a (c)
24
12.5
105
+117.5 AOD
Cooling equipment
Works No. 1a (d)
60
24
28.7
+41.2 AOD
Observation platform enclosure
Works No.1a (e)
17
13
6 (above +44.0 AOD)
+50 AOD
(2) Works No. 1b (Drawing C_0002 Rev 01 of the works plans)—
Description
Works No.
Height (m)
Height (m AOD)
Wastewater treatment facility, water pre-treatment plant, external stores and workshops, fuelling area and fuel storage, vehicle wash, transport offices and staff facilities, toilets, natural gas intake and management compound, fire control water tanks and electrical substations
Works No. 1b
18
30.5
(3) Works No. 2 (Drawing C_0005 Rev 01 of the works plans)—
Description
Works No.
Length (m)
Width (m)
Height (m)
Height (m AOD)
Resource recovery facility
Works No. 2 (a), (b) and (c)
127
180
20
+30.5 AOD
Maximum dimensions based on dimensions of enclosing rectangle oriented north-south.
(4) Works No. 3 (Drawing C_0007 Rev 01 of the works plans)—
Description
Works No.
Length (m)
Width (m)
Height (m)
Height (m AOD)
Visitor, community and education facilities, office accommodation and boat canopy
Works No. 3
41
16.7
14
+24.6 AOD

---
Source: https://www.legislation.gov.uk/uksi/2017/215/schedule/2/paragraph/5 (the official version)
Page: https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017/schedule-2/paragraph-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.