  "url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017/schedule-4",
  "json_url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017/schedule-4.json",
  "legislation": "uksi/2017/215",
  "legislation_title": "The North London Heat and Power Generating Station Order 2017",
  "legislation_url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017",
  "path": "schedule/4",
  "kind": "schedule",
  "number": "4",
  "heading": "STREETS SUBJECT TO STREET WORKS",
  "text": "(1)\nArea\n(2)\nStreets subject to street works\nIn the London Borough of Enfield.\nThe section of Lee Park Way starting from the junction with Advent Way, to the new access on the eastern edge of the Edmonton EcoPark from Lee Park Way. This section is within plots 14, 15, 21, 22 and 32 on the land plans.\nIn the London Borough of Enfield.\nThe section of Lee Park Way to north of the new access to be created on the eastern edge of the Edmonton EcoPark. This section is within plot 15 on the land plans.\nIn the London Borough of Enfield.\nThe section of Ardra Road, from its junction with Deephams Farm Road, to its junction with Meridian Way. This section is within plots 7 and 8 on the land plans.\nIn the London Borough of Enfield.\nThe section of Lower Hall Lane, from its junction with Walthamstow Avenue leading to proposed the temporary laydown area. This section is within plots 18, 19 and 20 on the land plans.\nIn the London Borough of Enfield.\nThe section of Advent Way at the entrance south of the Edmonton EcoPark. This section is within plot 31 on the land plans.\nIn the London Borough of Enfield.\nThe sections of cycle path within plots 14, 15, 17, 20, 21, 22, 24, 26, 27, and 32 on the land plans and also as shown on drawings C_0012 Rev 01, C_0013 Rev 00 and C_0014 Rev 01 of the works plans.\nIn the London Borough of Enfield.\nThe sections of footpaths within plots 8, 14, 15, 17, 21, 22, 24, 27, 28, 29, 30, 31 and 32 on the land plans and also as shown on drawings C_0012 Rev 01, C_0013 Rev 00 and C_0014 Rev 01 of the works plans.\nIn the London Borough of Enfield.\nThe section of the tow path running along the eastern side of the River Lee Navigation, within plot 17 on the land plans.\nIn the London Borough of Enfield.\nDeephams Farm Road, which is plot 6 on the land plans.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 4 in force at 18.3.2017, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2017/215/schedule/4",
    "retrieved_at": "2026-10-28T23:14:36.077392+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}