  "url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017/schedule-5",
  "json_url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017/schedule-5.json",
  "legislation": "uksi/2017/215",
  "legislation_title": "The North London Heat and Power Generating Station Order 2017",
  "legislation_url": "https://openlegislation.uk/north-london-heat-and-power-generating-station-order-2017",
  "path": "schedule/5",
  "kind": "schedule",
  "number": "5",
  "heading": "STREETS SUBJECT TO ALTERATION OF LAYOUT",
  "text": "(1) Area\n(2) Street to be altered\n(3) Description of alteration\n(4) Works number\nIn the London Borough of Enfield.\nThe section of Advent Way shown within plot 31 on the land plans.\nWorks to widen the existing access from Advent Way into the Edmonton EcoPark, including modification to kerb lines and pavements within plot 31.\n4(g)\nIn the London Borough of Enfield.\nThe section of Lee Park Way shown within plots 14, 15, 21, 22 and 32 on the land plans.\nWorks to reposition footpaths and cycle paths that run along the section of Lee Park Way falling within plots 14, 15, 21, 22 and 32.\nWorks to create a new access branching off the section of Lee Park Way within plot 15, into the Edmonton EcoPark. The installation of vehicle barriers on Lee Park Way near the new access from Lee Park Way into the Edmonton EcoPark and on Lee Park Way near its junction with Advent Way.\n4(i) and (j)\nIn the London Borough of Enfield.\nDeephams Farm Road.\nWorks to upgrade Deephams Farm Road to make it suitable for operational and construction traffic, including provision of a new security barrier and gatehouse, works to improve the road surface, and new fencing.\n4(k), (m) and (n)\nIn the London Borough of Enfield.\nLand on the verge of Lee Park Way within plots 28 and 29 as shown on the land plans.\nModification to kerb lines and pavements within these verges that fall within plots 28 and 29.\n4(q)\nIn the London Borough of Enfield.\nFootpath within plot 21 as shown on the land plans.\nCreation of a new footpath to branch out from the existing footpath within this plot 21 south east towards Advent Way.\n4(r)",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 5 substituted (6.7.2018) by The North London Heat and Power Generating Station (Correction) Order 2018 (S.I. 2018/822), art. 1, Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 5 in force at 18.3.2017, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2017/215/schedule/5",
    "retrieved_at": "2026-10-28T23:14:36.077392+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}