# The North Wales Wind Farms Connection Order 2016, Paragraph 3: Detailed Design

Extent: E+W+S

(1) The authorised development must be carried out in accordance with the approved plans, inclusive of any limits of deviation, bearing the references listed below and any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any Requirement—
Works plans
Submission document reference number 2.3.0-2.3.13 Option B (revision 0)
Access and rights of way plans
Submission document reference number 2.4.0-2.4.13 Option B (revision 0)
Section drawings
Submission document reference number 2.7.0-2.7.29 Option B (revision P7)
Compound layout drawing
Submission document reference number 2.7.30 (revision 1)
(2) Subject to article 4 (limits of deviation), the authorised development must be carried out in accordance with the parameters specified below—
Building or Structure
Maximum height Above Existing Ground Level (metres)
Minimum height Above Existing Ground Level (metres)
Double wood pole (each pole)
16.4
10.8
Terminal structure (cable connection)
15.8
11.8
Terminal structure (gantry)
14.7
12.7
(3) Any part of the authorised development must be designed substantially in accordance with the relevant design principles.

---
Source: https://www.legislation.gov.uk/uksi/2016/818/schedule/2/paragraph/3 (the official version)
Page: https://openlegislation.uk/north-wales-wind-farms-connection-order-2016/schedule-2/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.