# The Northampton Gateway Rail Freight Interchange Order 2019, Article 10: Permanent stopping up of streets

Extent: E+W+S

(1) Subject to the provisions of this article, the undertaker may, in connection with the carrying out of the authorised development, stop up permanently the streets specified in column (2) of Schedule 4 (streets to be permanently stopped up for which a substitute is to be provided) to the extent specified, by reference to the letters shown on the access and rights of way plans, in column (3) of that Schedule.
(2) No street specified in column (2) of Schedule 4 is to be wholly or partly stopped up under this article unless—
(a) the new street to be substituted for it, which is specified in column (4) of that Schedule, has been completed to the reasonable satisfaction of the relevant street authority and is open for use; or
(b) a temporary alternative route for the passage of such traffic as could have used the street to be stopped up is first provided and subsequently maintained by the undertaker between the commencement and termination points for the stopping up of the street until the completion and opening of the new street in accordance with sub-paragraph (a).
(3) Where a street has been stopped up under this article—
(a) all rights of way over or along the street so stopped up are extinguished; and
(b) the undertaker may appropriate and use for the purposes of the authorised development so much of the street as is bounded on both sides by land owned by the undertaker.
(4) Any person who suffers loss by the suspension or extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
(5) This article is subject to article 36 (apparatus and rights of statutory undertakers in stopped up streets).

---
Source: https://www.legislation.gov.uk/uksi/2019/1358/article/10 (the official version)
Page: https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/article-10
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

