{
  "url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/article-12",
  "json_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/article-12.json",
  "legislation": "uksi/2019/1358",
  "legislation_title": "The Northampton Gateway Rail Freight Interchange Order 2019",
  "legislation_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019",
  "path": "article/12",
  "kind": "article",
  "number": "12",
  "heading": "Public rights of way – creation, substitution and stopping up",
  "text": "(1) Subject to the provisions of this article, the undertaker may, in connection with the carrying out of the authorised development—\n(a) stop up each of the public rights of way specified in columns (1) and (2) of Part 1 of Schedule 5 (public rights of way to be permanently stopped up for which a substitute is to be provided) to the extent specified in column (3) of that Part of that Schedule;\n(b) provide the substitute public rights of way described in column (4) of Part 1 of Schedule 5 between the specified terminus points and where specified, on a detailed alignment to be agreed with the local highway authority at the stage of the authorised development identified in column (5) of that Part of that Schedule;\n(c) temporarily stop up public rights of way to the extent agreed with the relevant highway authority and provide substitute temporary public rights of way on an alignment to be agreed with the local highway authority prior to the temporary stopping up of the public right of way concerned; and\n(d) stop up each of the public rights of way specified in columns (1) and (2) of Part 2 of Schedule 5 (public rights of way to be permanently stopped up for which no substitute is to be provided) to the extent specified in column (3) of that Part of that Schedule at the stage of the authorised development identified in column (4) of that Part of that Schedule.\n(2) No public right of way specified in columns (1) and (2) of Part 1 of Schedule 5 may be wholly or partly stopped up under this article unless the permanent substitute public rights of way referred to in column (4) of Part 1 of Schedule 5 or an alternative temporary substitute public right of way agreed by the local highway authority has first been provided by the undertaker, to the reasonable satisfaction of the local highway authority.\n(3) Any temporary substitute right of way must be maintained by the undertaker with appropriate signage until the completion and opening of the permanent substitute public right of way specified in column (4) of Part 1 of Schedule 5.\n(4) The undertaker must in connection with carrying out of the authorised development provide the new public rights of way specified in columns (1) and (2) of Part 3 of Schedule 5 (new public rights of way to be created) to the extent specified in column (3) of that Part of that Schedule at the stage of the authorised development in column (4) of that Part of that Schedule.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Art. 12 in force at 30.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1358/article/12",
    "retrieved_at": "2026-10-28T22:36:33.123990+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}