  "url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/article-4",
  "json_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/article-4.json",
  "legislation": "uksi/2019/1358",
  "legislation_title": "The Northampton Gateway Rail Freight Interchange Order 2019",
  "legislation_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019",
  "path": "article/4",
  "kind": "article",
  "number": "4",
  "heading": "Parameters of authorised development",
  "text": "(1) The authorised development is to be carried out within the parameters shown and described on the parameters plan and in carrying out the authorised development the undertaker may—\n(a) deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans;\n(b) in respect of the highway works deviate vertically from the levels shown on the highway plans to a maximum of 1.5 metres upwards or downwards; and\n(c) in respect of the railway works comprised in Works Nos. 1 and 2 deviate vertically from the levels shown on the railway plans to a maximum of 1.5 metres upwards or downwards.\n(2) The maximum limits described in paragraph (1)(a) to (c) do not apply to constrain the authorised development when it is demonstrated by the undertaker, on application, to the relevant planning authority’s satisfaction, and the relevant planning authority certifies accordingly, that a deviation in excess of these limits would not be likely to give rise to any materially new or materially different significant effects on the environment that have not been assessed in the environmental statement.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Art. 4 in force at 30.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1358/article/4",
    "retrieved_at": "2026-10-28T22:36:33.123990+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}