{
  "url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-1/part-2",
  "json_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-1/part-2.json",
  "legislation": "uksi/2019/1358",
  "legislation_title": "The Northampton Gateway Rail Freight Interchange Order 2019",
  "legislation_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019",
  "path": "schedule/1/part/2",
  "kind": "part",
  "number": "2",
  "heading": "ASSOCIATED DEVELOPMENT",
  "text": "Associated development within the meaning of section 115(2) (development for which consent may be granted) of the 2008 Act comprising—\nIn the County of Northamptonshire and the District of South Northamptonshire and the Borough of Northampton—\nWorks No. 8\nWithin the area of land described on the works plans as Works No. 8—\n(1) Works to junction 15 of the M1 motorway the general arrangement of which is shown on the highway plans (Document 2.4B) comprising enlargement, widening and alteration of the gyratory that forms junction 15.\n(2) Works to the M1 motorway the general arrangement of which is shown on the highway plans (Documents 2.4A and 2.4B) including—\n(a) realignment, improvement and widening of the M1 slip roads between the mainline M1 motorway and the gyratory that forms junction 15;\n(b) realignment and improvement of merges and diverges between the mainline M1 motorway and the M1 slip roads;\n(c) removal of and alterations and extensions to drainage culverts; and\n(d) installation of gantries,\nor, as an alternative, works to the M1 motorway the general arrangement of which is shown on the highway plans (Documents 2.4T and 2.4U) including—\n(i) realignment, improvement and widening of the M1 slip roads between the mainline M1 motorway and the gyratory that forms junction 15;\n(ii) realignment and improvement of merges and diverges between the mainline M1 motorway and the M1 slip roads;\n(iii) removal of and alterations and extensions to drainage culverts; and\n(iv) installation of gantries.\n(3) Works to the A45 trunk road the general arrangement of which is shown on the highway plans (Document 2.4B) including—\n(a) realignment, widening and improvement of the A45;\n(b) improvement and signalisation of the junction between the C67 Watering Lane and the A45 Northbound;\n(c) removal of a parking lay-by;\n(d) removal of bus lay-bys;\n(e) removal of and alterations and extensions to drainage culverts; and\n(f) installation of gantries.\nWorks No. 9\nWithin the area of land described on the works plans as Works No. 9—\n(1) Works to Saxon Avenue the general arrangement of which is shown on the highway plans (Document 2.4B) comprising widening, improvement and alterations connecting to Works No. 8.\n(2) Works to the C67 Watering Lane the general arrangement of which is shown on the highway (Document 2.4B) plans including—\n(a) realignment and improvement connecting to Works No. 8; and\n(b) provision of a bus stop and an uncontrolled crossing.\n(3) Improvement of the Collingtree footpath bridge over the M1 motorway (and its northern approach) to provide a cycle track as shown on the access and rights of way plans (Document 2.3A).\nWorks No. 10\nWithin the area of land described on the works plans as Works No. 10 the construction of new sewers and improvements and alterations to existing sewers as shown on drawing number NGW-BWB-GEN-XX-SK-C-SK13 Rev P1 contained in Appendix 7.3 of the environmental statement.\nWorks No. 11\nWithin the area of land described on the works plans as Works No. 11—\n(1) Works to junction 15A of the M1 motorway the general arrangement of which is shown on the highway plans (Document 2.4F) including—\n(a) realignment, improvement and widening of the A43; and\n(b) improvement, widening and partial signalisation of the roundabouts north and south of the M1.\n(2) Realignment, improvement and widening of the A5123 the general arrangement of which is shown on the highway plans (Document 2.4F).\nWorks No. 12\nWithin the area of land described on the works plans as Works No. 12—\n(1) The alteration of the junction between the A508 and Blisworth Road (Parish of Courteenhall) the general arrangement of which is shown on the highway plans (Document 2.4C) including—\n(a) alterations to remove the ability for right turn manoeuvres including the construction of a central island;\n(b) realignment of the A508;\n(c) relocation of the bus stop lay-by; and\n(d) alterations to the access into the Courteenhall Estate.\n(2) Construction of a shared use footway and cycleway on the western side of the A508 the general arrangement of which is shown on the highway plans (Document 2.4C) connecting with that provided within Works Nos. 7 and 13.\n(3) Construction of an uncontrolled pedestrian crossing of the A508 the general arrangement of which is shown on the highway plans (Document 2.4C) at the junction between the A508 and the unnamed road to Quinton.\nWorks No. 13\nWithin the area of land described on the works plans as Works No. 13—\n(1) The construction of a new highway linking the A508 Northampton Road to the A508 Stratford Road, bypassing the village of Roade (to be known as the Roade Bypass), the general arrangement of which is shown on the highway plans (Documents 2.4C, 2.4D and 2.4E) including—\n(a) roundabout junctions between the Roade Bypass and the A508 Northampton Road, A508 Stratford Road and Blisworth Road (Parish of Roade);\n(b) drainage swales and attenuation features;\n(c) a bridge over the West Coast Main Line railway;\n(d) an underpass for bridleway RZ1/KZ10;\n(e) the stopping up and substitution of parts of existing public rights of way KZ2a, KZ19, and RZ3;\n(f) the construction of a shared use footway and cycleway;\n(g) environmental mitigation bunds and acoustic fencing;\n(h) ecological mitigation areas;\n(i) temporary construction compounds; and\n(j) the alteration of private accesses as shown on the access and rights of way plans.\nWorks No. 14\nWithin the area of land shown on the works plans as Works No. 14—\n(1) The improvement of the junction between the A508 and the C26 the general arrangement of which is shown on the highway plans (Document 2.4E) including—\n(a) realignment of the A508;\n(b) improvement and enlargement of the priority junction between the A508 and C26 Rookery Lane and between the A508 and C26 Ashton Road;\n(c) construction of a footway and a shared use footway and cycleway;\n(d) uncontrolled crossings of the A508 and C26; and\n(e) the alteration of a private access as shown on the access and rights of way plans.\nWorks No. 15\nWithin the area of land shown on the works plans as Works No. 15—\n(1) The improvement of the junction between the A508 and the C85 Pury Road the general arrangement of which is shown on the highway plans (Document 2.4F) including—\n(a) widening and realignment of the A508; and\n(b) extension of the ghost island right turn lane at the junction between the A508 and C85 Pury Road.\nWorks No. 16\nWithin the area of land shown on the works plans as Works No. 16—\n(1) The improvement of the junction between the C27 Stoke Road and Knock Lane the general arrangement of which is shown on the highway plans (Document 2.4F) including—\n(a) widening of Knock Lane on the approach to the C27 Stoke Road; and\n(b) drainage improvements.\n(2) The widening of Knock Lane and Blisworth Road (Parish of Roade) the general arrangement of which is shown on the highway plans (Document 2.4F).\nWorks No. 17\nWithin the area of land described on the works plans as Works No. 17—\n(1) The improvement of the A508 in Grafton Regis the general arrangement of which is shown on the highway plans (Document 2.4F) including—\n(a) a refuge island on the A508;\n(b) removal of a parking lay-by;\n(c) alterations to a bus stop lay-by and footway; and\n(d) a ghost island right turn junction at Church Lane.\nFurther works\nThe following further works provided that such works are not likely to give rise to any materially new or materially different significant effects on the environment that have not been assessed in the environmental statement or in any updated environmental information supplied under the 2017 EIA Regulations—\n(1) Within the area of land described on the works plans as Works Nos. 1 to 5 the provision of—\n(a) weighbridges;\n(b) internal estate roads, maintenance accesses and footways;\n(c) cycle parking facilities;\n(d) bus turning-head;\n(e) substations;\n(f) demolition of buildings and structures; and\n(g) such other works as may be necessary or expedient for the purpose of or in connection with the construction of the Works Nos 1 to 17.\n(2) Within the area of land described on the works plans as Works Nos. 1 to 6—\n(a) swales, landscaping and boundary treatments, earthworks and earthwork retaining structures;\n(b) the provision of footways, cycle tracks, permissive cycle tracks, bridleways and footpath linkages;\n(c) water supply works, foul drainage provision, foul pumping stations, surface water management systems, balancing ponds (surface and underground), attenuation and culverting;\n(d) connections to mains services and provision of utilities infrastructure including primary and secondary substations and pressure reducing stations;\n(e) diversion and provision of utilities including foul water sewers;\n(f) relocation of existing communications masts;\n(g) demolition of surface structures;\n(h) temporary concrete batching plants during the period of construction of the authorised development;\n(i) temporary construction compounds and materials and aggregate store during the period of construction of the authorised development;\n(j) lighting;\n(k) signage;\n(l) CCTV equipment; and\n(m) such other works as may be necessary or expedient for the purpose of or in connection with the construction of Works Nos. 1 to 17.\n(3) Within the area of land described on the works plans as Works Nos. 7 to 9 and 11 to 17 the provision of—\n(a) site clearance and excavation;\n(b) removal of existing and creation of new private means of accesses in the locations shown on the access and rights of way plans;\n(c) fencing for boundary treatment and noise attenuation;\n(d) safety barriers;\n(e) surface water drainage works including swales, attenuation, outfalls, headwalls and culverting;\n(f) ducting;\n(g) bunds, embankments, cuttings, landscaping, earthworks and earthwork retaining structures;\n(h) pavements, surface treatments, refuge islands, kerbs and channels;\n(i) the provision of footways, cycle tracks, bridleways and footpath linkages;\n(j) traffic signs, traffic signals and road markings;\n(k) street lighting and electrical equipment;\n(l) retaining walls;\n(m) diversion and provision of utilities including foul water sewers;\n(n) temporary earthworks material stockpiles;\n(o) demolition of buildings and structures; and\n(p) such other works as may be necessary or expedient for the purpose of or in connection with the construction of Works Nos 1 to 17.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 Pt. 2 in force at 30.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1358/schedule/1/part/2",
    "retrieved_at": "2026-10-28T22:36:33.123990+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}