{
  "url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-16",
  "json_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-16.json",
  "legislation": "uksi/2019/1358",
  "legislation_title": "The Northampton Gateway Rail Freight Interchange Order 2019",
  "legislation_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019",
  "path": "schedule/16",
  "kind": "schedule",
  "number": "16",
  "heading": "CERTIFICATION OF PLANS AND DOCUMENTS",
  "text": "Document/Plan\nDocument Number\nDocument date/Plan number with revision number\nAccess and rights of way plans\nKey Plan\n2.3\nNGW-BWB-LSI-XX-DR-C-00170-P5\nSheet 1\n2.3A\nNGW-BWB-LSI-01-DR-C-00171-P6\nSheet 2\n2.3B\nNGW-BWB-LSI-02-DR-C-00172-P5\nSheet 3\n2.3C\nNGW-BWB-LSI-03-DR-C-00173-P7\nSheet 4\n2.3D\nNGW-BWB-LSI-04-DR-C-00174-P7\nSheet 5\n2.3E\nNGW-BWB-LSI-05-DR-C-00175-P5\nThe book of reference\n4.3B\n26 March 2019\nThe design and access statement\n6.9\nRev S2 18 May 2018\nThe environmental statement\n5.2\n18 May 2018 (subject to the substitutions set out below):\n(i) Figures 2.1, 2.2, 2.3 and 10.1 – 13 August 2018;\n(ii) Appendix 2.1 (Construction and Environmental Management Plan) –19 March 2019;\n(iii) Appendix 2.4 (Comparative Assessment of Northampton Gateway and Rail Central) – 8 January 2019;\n(iv) Appendix 5.12 (Landscape and Ecological Management Plan) – 30 November 2018\n(v) Chapter 9 (Air Quality) – 26 February 2019\nThe highway classification plans\nKey Plan\n2.5\nNGW-BWB-LSI-XX-DR-C-180-P5\nSheet 1\n2.5A\nNGW-BWB-LSI-01-DR-C-181-P5\nSheet 2\n2.5B\nNGW-BWB-LSI-02-DR-C-182-P5\nSheet 3\n2.5C\nNGW-BWB-LSI-03-DR-C-183-P6\nSheet 4\n2.5D\nNGW-BWB-LSI-04-DR-C-184-P5\nThe highway plans\nKey Plan\n2.4\nNGW-BWB-HGN-XX-DR-C-100-P6\nGeneral Arrangement Sheet 1\n2.4A\nNGW-BWB-HGN-01-DR-C-101-P8\nGeneral Arrangement Sheet 2\n2.4B\nNGW-BWB-HGN-02-DR-C-102-P9\nGeneral Arrangement Sheet 3\n2.4C\nNGW-BWB-HGN-03-DR-C-103-P9\nGeneral Arrangement Sheet 4\n2.4D\nNGW-BWB-HGN-04-DR-C-104-P10\nGeneral Arrangement Sheet 5\n2.4E\nNGW-BWB-HGN-05-DR-C-105-P8\nGeneral Arrangement Sheet 6\n2.4F\nNGW-BWB-HGN-06-DR-C-106-P9\nCross Sections Sheet 1\n2.4G\nNGW-BWB-HGN-01-DR-C-131-P7\nCross Sections Sheet 2\n2.4H\nNGW-BWB-HGN-02-DR-C-132-P5\nCross Sections Sheet 3\n2.4J\nNGW-BWB-HGN-03-DR-C-133-P5\nCross Sections Sheet 4\n2.4K\nNGW-BWB-HGN-04-DR-C-134-P6\nCross Sections Sheet 5\n2.4L\nNGW-BWB-HGN-05-DR-C-135-P4\nLong Sections Sheet 1\n2.4M\nNGW-BWB-HGN-01-DR-C-141-P7\nLong Sections Sheet 2\n2.4N\nNGW-BWB-HGN-02-DR-C-142-P6\nLong Sections Sheet 3\n2.4P\nNGW-BWB-HGN-03-DR-C-143-P6\nLong Sections Sheet 4\n2.4Q\nNGW-BWB-HGN-04-DR-C-144-P4\nLong Sections Sheet 5\n2.4R\nNGW-BWB-HGN-05-DR-C-00145-P4\nLong Sections Sheet 6\n2.4S\nNGW-BWB-HGN-06-DR-C-146-P3\nGeneral Arrangement Alternative to Document 2.4A\n2.4T\nNGW-BWB-HGN-01-DR-C-107-P3\nGeneral Arrangement Alternative to Document 2.4B\n2.4U\nNGW-BWB-HGN-02-DR-C-108-P4\nThe illustrative rail terminal plan\n2.8\n4054-17-S1\nThe land plans\nKey Plan\n2.1\n62241114-001 2.1 08\nSheet 1\n2.1A\n62241114-001 2.1A 06\nSheet 2\n2.1B\n62241114-001 2.1B 08\nSheet 3\n2.1C\n62241114-001 2.1C 06\nSheet 4\n2.1D\n62241114-001 2.1D 09\nSheet 5\n2.1E\n62241114-001 2.1E 06\nSheet 6\n2.1F\n62241114-001 2.1F 07\nThe parameters plan\n2.10\n4054-R007-S4\nThe railway plans\nGeneral Arrangement\n2.9A\nNGW-BWB-RGN-XX-DR-C-110-P6\nLong Sections Sheet 1 of 2\n2.9B\nNGW-BWB-RGN-01-DR-C-111-P4\nLong Sections Sheet 2 of 2\n2.9C\nNGW-BWB-RGN-02-DR-C-112-P4\nCross Sections\n2.9D\nNGW-BWB-RGN-XX-DR-C-113-P4\nThe Rail Central footpath connections plan\n2.15\nNGW-BWB-GEN-XX-SK-C-SK91-P3\nThe speed limit plans\nKey Plan\n2.7\nNGW-BWB-LSI-XX-DR-C-00190-P5\nSheet 1\n2.7A\nNGW-BWB-LSI-01-DR-C-00191-P6\nSheet 2\n2.7B\nNGW-BWB-LSI-02-DR-C-00192-P6\nSheet 3\n2.7C\nNGW-BWB-LSI-03-DR-C-00193-P7\nSheet 4\n2.7D\nNGW-BWB-LSI-04-DR-C-00194-P5\nThe traffic regulation plans\nKey Plan\n2.6\nNGW-BWB-LSI-XX-DR-C-00150-P5\nSheet 1\n2.6A\nNGW-BWB-LSI-01-DR-C-00151-P3\nSheet 2\n2.6B\nNGW-BWB-LSI-02-DR-C-00152-P3\nSheet 3\n2.6C\nNGW-BWB-LSI-03-DR-C-00153-P1\nThe works plans\nKey Plan\n2.2\nNGW-BWB-LSI-XX-DR-C-00160-P13\nSheet 1\n2.2A\nNGW-BWB-LSI-01-DR-C-00161-P10\nSheet 2\n2.2B\nNGW-BWB-LSI-02-DR-C-00162-P7\nSheet 3\n2.2C\nNGW-BWB-LSI-03-DR-C-00163-P8\nSheet 4\n2.2D\nNGW-BWB-LSI-04-DR-C-00164-P6\nSheet 5\n2.2E\nNGW-BWB-LSI-05-DR-C-00165-P6\nSheet 6\n2.2F\nNGW-BWB-LSI-06-DR-C-00166-P6\nSheet 7\n2.2G\nNGW-BWB-LSI-XX-DR-C-00167-P5\nThe rail infrastructure plan\n-\nNGW-BWB-GEN-XX-SK-C-SK315-S2-P01",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Word in Sch. 16 substituted (3.10.2025) by The Northampton Gateway Rail Freight Interchange (Amendment No. 2) Order 2025 (S.I. 2025/1057), arts. 1, 2(2)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Word in Sch. 16 substituted (7.10.2020) by The Northampton Gateway Rail Freight Interchange (Correction) Order 2020 (S.I. 2020/1670), arts. 1, 2(4)(a)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Word in Sch. 16 substituted (7.10.2020) by The Northampton Gateway Rail Freight Interchange (Correction) Order 2020 (S.I. 2020/1670), arts. 1, 2(4)(b)"
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Words in Sch. 16 table inserted (7.4.2023) by The Northampton Gateway Rail Freight Interchange (Amendment) Order 2023 (S.I. 2023/418), arts. 1, 2(4)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 16 in force at 30.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1358/schedule/16",
    "retrieved_at": "2026-10-28T22:36:33.123990+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}