# The Northampton Gateway Rail Freight Interchange Order 2019, Schedule 16: CERTIFICATION OF PLANS AND DOCUMENTS

Extent: E+W+S

Document/Plan
Document Number
Document date/Plan number with revision number
Access and rights of way plans
Key Plan
2.3
NGW-BWB-LSI-XX-DR-C-00170-P5
Sheet 1
2.3A
NGW-BWB-LSI-01-DR-C-00171-P6
Sheet 2
2.3B
NGW-BWB-LSI-02-DR-C-00172-P5
Sheet 3
2.3C
NGW-BWB-LSI-03-DR-C-00173-P7
Sheet 4
2.3D
NGW-BWB-LSI-04-DR-C-00174-P7
Sheet 5
2.3E
NGW-BWB-LSI-05-DR-C-00175-P5
The book of reference
4.3B
26 March 2019
The design and access statement
6.9
Rev S2 18 May 2018
The environmental statement
5.2
18 May 2018 (subject to the substitutions set out below):
(i) Figures 2.1, 2.2, 2.3 and 10.1 – 13 August 2018;
(ii) Appendix 2.1 (Construction and Environmental Management Plan) –19 March 2019;
(iii) Appendix 2.4 (Comparative Assessment of Northampton Gateway and Rail Central) – 8 January 2019;
(iv) Appendix 5.12 (Landscape and Ecological Management Plan) – 30 November 2018
(v) Chapter 9 (Air Quality) – 26 February 2019
The highway classification plans
Key Plan
2.5
NGW-BWB-LSI-XX-DR-C-180-P5
Sheet 1
2.5A
NGW-BWB-LSI-01-DR-C-181-P5
Sheet 2
2.5B
NGW-BWB-LSI-02-DR-C-182-P5
Sheet 3
2.5C
NGW-BWB-LSI-03-DR-C-183-P6
Sheet 4
2.5D
NGW-BWB-LSI-04-DR-C-184-P5
The highway plans
Key Plan
2.4
NGW-BWB-HGN-XX-DR-C-100-P6
General Arrangement Sheet 1
2.4A
NGW-BWB-HGN-01-DR-C-101-P8
General Arrangement Sheet 2
2.4B
NGW-BWB-HGN-02-DR-C-102-P9
General Arrangement Sheet 3
2.4C
NGW-BWB-HGN-03-DR-C-103-P9
General Arrangement Sheet 4
2.4D
NGW-BWB-HGN-04-DR-C-104-P10
General Arrangement Sheet 5
2.4E
NGW-BWB-HGN-05-DR-C-105-P8
General Arrangement Sheet 6
2.4F
NGW-BWB-HGN-06-DR-C-106-P9
Cross Sections Sheet 1
2.4G
NGW-BWB-HGN-01-DR-C-131-P7
Cross Sections Sheet 2
2.4H
NGW-BWB-HGN-02-DR-C-132-P5
Cross Sections Sheet 3
2.4J
NGW-BWB-HGN-03-DR-C-133-P5
Cross Sections Sheet 4
2.4K
NGW-BWB-HGN-04-DR-C-134-P6
Cross Sections Sheet 5
2.4L
NGW-BWB-HGN-05-DR-C-135-P4
Long Sections Sheet 1
2.4M
NGW-BWB-HGN-01-DR-C-141-P7
Long Sections Sheet 2
2.4N
NGW-BWB-HGN-02-DR-C-142-P6
Long Sections Sheet 3
2.4P
NGW-BWB-HGN-03-DR-C-143-P6
Long Sections Sheet 4
2.4Q
NGW-BWB-HGN-04-DR-C-144-P4
Long Sections Sheet 5
2.4R
NGW-BWB-HGN-05-DR-C-00145-P4
Long Sections Sheet 6
2.4S
NGW-BWB-HGN-06-DR-C-146-P3
General Arrangement Alternative to Document 2.4A
2.4T
NGW-BWB-HGN-01-DR-C-107-P3
General Arrangement Alternative to Document 2.4B
2.4U
NGW-BWB-HGN-02-DR-C-108-P4
The illustrative rail terminal plan
2.8
4054-17-S1
The land plans
Key Plan
2.1
62241114-001 2.1 08
Sheet 1
2.1A
62241114-001 2.1A 06
Sheet 2
2.1B
62241114-001 2.1B 08
Sheet 3
2.1C
62241114-001 2.1C 06
Sheet 4
2.1D
62241114-001 2.1D 09
Sheet 5
2.1E
62241114-001 2.1E 06
Sheet 6
2.1F
62241114-001 2.1F 07
The parameters plan
2.10
4054-R007-S4
The railway plans
General Arrangement
2.9A
NGW-BWB-RGN-XX-DR-C-110-P6
Long Sections Sheet 1 of 2
2.9B
NGW-BWB-RGN-01-DR-C-111-P4
Long Sections Sheet 2 of 2
2.9C
NGW-BWB-RGN-02-DR-C-112-P4
Cross Sections
2.9D
NGW-BWB-RGN-XX-DR-C-113-P4
The Rail Central footpath connections plan
2.15
NGW-BWB-GEN-XX-SK-C-SK91-P3
The speed limit plans
Key Plan
2.7
NGW-BWB-LSI-XX-DR-C-00190-P5
Sheet 1
2.7A
NGW-BWB-LSI-01-DR-C-00191-P6
Sheet 2
2.7B
NGW-BWB-LSI-02-DR-C-00192-P6
Sheet 3
2.7C
NGW-BWB-LSI-03-DR-C-00193-P7
Sheet 4
2.7D
NGW-BWB-LSI-04-DR-C-00194-P5
The traffic regulation plans
Key Plan
2.6
NGW-BWB-LSI-XX-DR-C-00150-P5
Sheet 1
2.6A
NGW-BWB-LSI-01-DR-C-00151-P3
Sheet 2
2.6B
NGW-BWB-LSI-02-DR-C-00152-P3
Sheet 3
2.6C
NGW-BWB-LSI-03-DR-C-00153-P1
The works plans
Key Plan
2.2
NGW-BWB-LSI-XX-DR-C-00160-P13
Sheet 1
2.2A
NGW-BWB-LSI-01-DR-C-00161-P10
Sheet 2
2.2B
NGW-BWB-LSI-02-DR-C-00162-P7
Sheet 3
2.2C
NGW-BWB-LSI-03-DR-C-00163-P8
Sheet 4
2.2D
NGW-BWB-LSI-04-DR-C-00164-P6
Sheet 5
2.2E
NGW-BWB-LSI-05-DR-C-00165-P6
Sheet 6
2.2F
NGW-BWB-LSI-06-DR-C-00166-P6
Sheet 7
2.2G
NGW-BWB-LSI-XX-DR-C-00167-P5
The rail infrastructure plan
-
NGW-BWB-GEN-XX-SK-C-SK315-S2-P01

---
Source: https://www.legislation.gov.uk/uksi/2019/1358/schedule/16 (the official version)
Page: https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-16
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

