# The Northampton Gateway Rail Freight Interchange Order 2019, Paragraph 32: Rail Central

Extent: E+W+S

If the Rail Central Order comes into force prior to the approval of the details of works comprised in Works No. 1(1)(d) under requirement 8 (detailed design approval), the relevant planning authority, after consultation with Network Rail, will only approve the details if satisfied that the works are compatible with the Rail Central development (meaning that the works do not prevent the construction of a new railway line from the Rail Central development to connect with the existing Northampton Loop railway line).

---