{
  "url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-4",
  "json_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-4.json",
  "legislation": "uksi/2019/1358",
  "legislation_title": "The Northampton Gateway Rail Freight Interchange Order 2019",
  "legislation_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019",
  "path": "schedule/4",
  "kind": "schedule",
  "number": "4",
  "heading": "STREETS TO BE PERMANENTLY STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED",
  "text": "(1)\nArea\n(2)\nStreet to be stopped up\n(3)\nExtent of stopping up\n(4)\nNew street to be substituted\nDistrict of South Northamptonshire and Borough of Northampton\nM1 motorway slip road\nThe existing highway within the area marked i on the access and rights of way plans (Document 2.3B) shown edged blue with red and white hatching.\nProposed highway M1 within the area marked ii on the access and rights of way plans (Inset 2A of Document 2.3B) shown edged blue with blue hatching.\nDistrict of South Northamptonshire\nBlisworth Road\n(Parish of Roade)\nThe existing highway within the area marked iii on the access and rights of way plans (Document 2.3D) shown edged blue with red and white hatching.\n(i) Proposed highway within the area marked iv on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching;\n(ii) Proposed highway A508 within the area marked v on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching; and\n(iii) Proposed highway within the area marked vi on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching.\nA508 highway\nThe existing highway within the area marked vii on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching.\n(i) Proposed highway within the area marked viii on the access and rights of way plans (Inset 5A of Document 2.3E) shown edged blue with orange hatching; and\n(ii) Proposed highway A508 within the area marked ix on the access and rights of way plans (Inset 5A of Document 2.3E) shown edged blue with orange hatching.\nA508 highway\nThe existing highway within the area marked x on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching.\nProposed highway A508 within the area marked xi on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching.\nC26 Rookery Lane\nThe existing highway within the area marked xii on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching.\nProposed highway C26 within the area marked xiii on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching.\nC26 Ashton Road\nThe existing highway within the area marked xiv on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching.\nProposed highway C26 within the area marked xv on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 4 in force at 30.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1358/schedule/4",
    "retrieved_at": "2026-10-28T22:36:33.123990+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}