# The Northampton Gateway Rail Freight Interchange Order 2019, Part 3: NEW PUBLIC RIGHTS OF WAY TO BE CREATED

Extent: E+W+S

(1)
Area
(2)
Public right of way to be created
(3)
Extent of new public right of way to be created
(4)
Stage of the authorised development
Parish of Roade
Cycle track
Proposed cycle track between the points marked 18-22 on the access and rights of way plans (Document 2.3D) shown indicatively with a dashed pink line on a detailed alignment to be agreed with the local highway authority and constructed as part of Works No. 13.
Completion of Works No. 13
Parish of Milton Malsor
Public footpath
Proposed public footpath between the points marked 6-27 of the access and rights of way plans (Document 2.3A) shown indicatively with a dashed and dotted brown line detailed alignment to be agreed with the local highway authority and constructed as part of Works No. 6.
Completion of Works No. 6
Cycle track
Proposed cycle track between the points marked 28-30 on the access and rights of way plans (Document 2.3B) shown indicatively with a dashed pink line on a detailed alignment to be agreed with the local highway authority and constructed as part of Works Nos. 4, 5 and 6.
Completion of Works No. 7
Cycle track
Proposed cycle track between the points marked 9-10 on the access and rights of way plans (Document 2.3C) shown indicatively with a dashed pink line on a detailed alignment to be agreed with the local highway authority and constructed as part of Works No. 4.
Completion of Works No. 6
Public footpath
Proposed public footpath between the points marked 10-11-1 on the access and rights of way plans (Documents 2.3A and 2.3C) shown indicatively with a dashed and dotted brown line on a detailed alignment to be agreed with the local highway authority and constructed as part of Works Nos. 4 and 6.
Completion of Works No. 6

---
Source: https://www.legislation.gov.uk/uksi/2019/1358/schedule/5/part/3 (the official version)