{
  "url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-7/part-2",
  "json_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-7/part-2.json",
  "legislation": "uksi/2019/1358",
  "legislation_title": "The Northampton Gateway Rail Freight Interchange Order 2019",
  "legislation_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019",
  "path": "schedule/7/part/2",
  "kind": "part",
  "number": "2",
  "heading": "EXISTING HIGHWAYS",
  "text": "(1)\nArea\n(2)\nExtent of Highway\n(3)\n(i) Current Classification\n(ii) Highway Authority\n(4)\nEvent determining change of classification\n(5)\nProposed Classification\n(6)\nClasses of Traffic\n(7)\nHighway Authority\nDistrict of South Northamptonshire\nThe length of highway the centreline of which is shown coloured dark blue and between the points 1 and 2 on the highway classification plans (Document 2.5A).\n(i) All Purpose Trunk Road\n(ii) Highways England\nOpening to traffic of the length of highway stated in column (2).\nSpecial Road\nClass I and Class II\nHighways England\nThe length of highway the centreline of which is shown coloured orange and between the points 5 and 6 on the highway classification plans (Document 2.5A).\n(i) Unclassified Road\n(ii) The local highway authority\nCommencement of Works No. 8 shown on the works plans (Documents 2.2A and 2.2B).\nTrunk Road\nAll purpose\nHighways England\nThe length of highway the centreline of which is shown coloured dark blue and between the points 7 and 8 on the highway classification plans (Document 2.5A).\n(i) All Purpose Trunk Road\n(ii) Highways England\nOpening to traffic of the length of highway stated in column (2).\nSpecial Road\nClass I and Class II\nHighways England\nThe length of highway the centreline of which is shown coloured orange and between the points 9 and 10 on the highway classification plans (Document 2.5A).\n(i) Principal Road\n(ii) The local highway authority\nCommencement of Works No. 8 shown on the works plans (Documents 2.2A and 2.2B).\nTrunk Road\nAll purpose\nHighways England",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 7 Pt. 2 in force at 30.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1358/schedule/7/part/2",
    "retrieved_at": "2026-10-28T22:36:33.123990+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}