# The Northampton Gateway Rail Freight Interchange Order 2019, Part 2: EXISTING HIGHWAYS

Extent: E+W+S

(1)
Area
(2)
Extent of Highway
(3)
(i) Current Classification
(ii) Highway Authority
(4)
Event determining change of classification
(5)
Proposed Classification
(6)
Classes of Traffic
(7)
Highway Authority
District of South Northamptonshire
The length of highway the centreline of which is shown coloured dark blue and between the points 1 and 2 on the highway classification plans (Document 2.5A).
(i) All Purpose Trunk Road
(ii) Highways England
Opening to traffic of the length of highway stated in column (2).
Special Road
Class I and Class II
Highways England
The length of highway the centreline of which is shown coloured orange and between the points 5 and 6 on the highway classification plans (Document 2.5A).
(i) Unclassified Road
(ii) The local highway authority
Commencement of Works No. 8 shown on the works plans (Documents 2.2A and 2.2B).
Trunk Road
All purpose
Highways England
The length of highway the centreline of which is shown coloured dark blue and between the points 7 and 8 on the highway classification plans (Document 2.5A).
(i) All Purpose Trunk Road
(ii) Highways England
Opening to traffic of the length of highway stated in column (2).
Special Road
Class I and Class II
Highways England
The length of highway the centreline of which is shown coloured orange and between the points 9 and 10 on the highway classification plans (Document 2.5A).
(i) Principal Road
(ii) The local highway authority
Commencement of Works No. 8 shown on the works plans (Documents 2.2A and 2.2B).
Trunk Road
All purpose
Highways England

---
Source: https://www.legislation.gov.uk/uksi/2019/1358/schedule/7/part/2 (the official version)
Page: https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-7/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.