# The Northampton Gateway Rail Freight Interchange Order 2019, Part 1: EXISTING ORDERS

Extent: E+W+S

(1)
Statutory Instrument / Order Title
(2)
S.I. Number
(3)
Changes
(4)
Event
Northamptonshire County Council (A508 Northampton to Old Stratford Road, Northampton) (40 mph Speed Limit) Order 2000
To be revoked in its entirety.
Opening to traffic of the highway works within Works No. 8
The A45 Trunk Road (Thrapston to Northampton, Northamptonshire) (Derestriction) Order 2011
2011 No. 592
In the Schedule—
(i) for paragraphs 16 and 17, substitute—
“16. the southbound carriageway of the A45 from a point 133 metres southwest of its junction with the exit slip road leading to its roundabout junction with the A508 and B526, known as Queen Eleanor Roundabout, Northampton, to a point 390 metres north of the junction between the A45 and Watering Lane;
17. the northbound carriageway of the A45 from a point 390 metres north its junction with Watering Lane, to a point 138 metres south of its junction with the entry slip road leading from Queen Eleanor Roundabout;”; and
(ii) omit paragraph 22.
Opening to traffic of the highway works within Works No. 8
The Northamptonshire County Council (Various Roads, South Northamptonshire District and Northampton Borough) (30mph, 40mph and 50mph speed limit) Order 2013
In Schedule 3—
(i) for—
“Northampton Road, Roade / Courteenhall – from a point 50 metres north of its junction with London Road to a point 30 metres north of its junction with Blisworth Road”
substitute—
“Northampton Road, Roade / Courteenhall – from its roundabout junction with the Roade Bypass to a point 30 metres north of its junction with the unnamed road to Quinton”; and
(ii) for—
“Stratford Road, Roade / Northampton Road, Stoke Bruerne – a point 512 metres south of its junction with High Street, Roade for a distance of 2.5 kilometres in a southerly direction.”
substitute—
“Northampton Road, Stoke Bruerne – a point 250 metres south of the roundabout junction between the A508 Roade Bypass and Stratford Road for a distance of 1.75 kilometres in a southerly direction.”
Opening to traffic of the Roade Bypass constructed as part of Works No. 13

---
Source: https://www.legislation.gov.uk/uksi/2019/1358/schedule/8/part/1 (the official version)
Page: https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-8/part-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.