{
  "url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-8/part-2",
  "json_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-8/part-2.json",
  "legislation": "uksi/2019/1358",
  "legislation_title": "The Northampton Gateway Rail Freight Interchange Order 2019",
  "legislation_url": "https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019",
  "path": "schedule/8/part/2",
  "kind": "part",
  "number": "2",
  "heading": "HIGHWAYS SUBJECT TO 50MPH SPEED LIMIT",
  "text": "(1)\nLocation\n(2)\nDescription\n(3)\nEvent\nA45 Northbound\nFrom a point 80 metres north of the M1 overbridge to a point 390 metres north of the junction between the A45 and Watering Lane; the centreline of which is shown coloured green between points A and B as shown on the speed limit plans (Document 2.7A).\nCompletion of Works No. 8\nA45 Southbound\nFrom a point 390 metres north of the junction between the A45 and Watering Lane to a point 115 metres north of the M1 overbridge; the centreline of which is shown coloured green between points C and E as shown on the speed limit plans (Document 2.7A)\nCompletion of Works No. 8\nA45 Southbound merge slip road from the Bridge Meadow Way roundabout\nFrom a point 165 metres north of the merge with the A45 southbound to the merge itself; the centreline of which is shown coloured green between points F and D as shown on the speed limit plans (Document 2.7A).\nCompletion of Works No. 8\nA45 signalised roundabout at M1 Junction 15\nThe circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured green between points E, G, H, J, K, L, A and returning to E as shown on the speed limit plans (Document 2.7A).\nCompletion of Works No. 8\nLink road within A45 signalised roundabout at M1 Junction 15\nThe link road within the circulatory carriageway at the junction between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured green between points H and L as shown on the speed limit plans (Document 2.7A).\nCompletion of Works No. 8\nSaxon Avenue\nFrom the junction between Saxon Avenue and the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15 to a point 30 metres west of that junction; the centreline of which is shown coloured green between points G and M as shown on the speed limit plans (Document 2.7A).\nCompletion of Works No. 8\nA508 Northbound\nFrom the roundabout junction between the A508 and the main site access road to the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured orange between points N and P as shown on the speed limit plans (Document 2.7A).\nCompletion of Works No. 7\nA508 Southbound\nFrom the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15 to the roundabout junction between the A508 and the main site access road; the centreline of which is shown coloured orange between points Q and R as shown on the speed limit plans (Document 2.7A).\nCompletion of Works No. 7\nA508 Northampton Road and rail terminal access road roundabout\nThe circulatory carriageway of the roundabout junction between the main site access road and Northampton Road; the centreline of which is shown coloured orange between points N, R, S and returning to N as shown on the speed limit plans (Document 2.7A).\nCompletion of Works No. 7\nA508 Northampton Road\nFrom the roundabout junction between the A508 and the main site access road to a point 30 metres north of the junction between the A508 and the unnamed road to Quinton; the centreline of which is shown coloured orange between points S and T as shown on the speed limit plans (Documents 2.7A and 2.7B).\nCompletion of Works No. 7\nA508 Roade Bypass and Northampton Road roundabout\nThe circulatory carriageway of the roundabout junction between the A508 Roade Bypass and Northampton Road; the centreline of which is shown coloured orange between points U, AL, V and returning to U as shown on the speed limit plans (Document 2.7B).\nCompletion of Works No. 13\nStratford Road\nFrom a point 512 metres south of the junction between Stratford Road and High Street to the roundabout junction between the A508 Roade Bypass and Stratford Road; the centreline of which is shown coloured orange between points AG and AJ as shown on the speed limit plans (Document 2.7C).\nCompletion of Works No. 13\nA508 Roade Bypass and Stratford Road roundabout\nThe circulatory carriageway of the roundabout junction between the A508 Roade Bypass and Stratford Road; the centreline of which is shown coloured orange between points AF, AG, AH and returning to AF as shown on the speed limit plans (Document 2.7C).\nCompletion of Works No. 13\nA508\nFrom a point 250 metres south of the roundabout junction between the A508 Roade Bypass and Stratford Road to that junction; the centreline of which is shown coloured orange between points AH and AK as shown on the speed limit plans (Document 2.7C).\nCompletion of Works No. 13\nNorthampton Road\nFrom the roundabout junction between the A508 Roade Bypass and Northampton Road to a point 162 metres south of that roundabout; the centreline of which is shown coloured orange between points AL and AM as shown on the speed limit plans (Document 2.7B).\nCompletion of Works No. 13",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 8 Pt. 2 in force at 30.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1358/schedule/8/part/2",
    "retrieved_at": "2026-10-28T22:36:33.123990+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}