# The Northampton Gateway Rail Freight Interchange Order 2019, Part 3: DERESTRICTED HIGHWAYS

Extent: E+W+S

(1)
Location
(2)
Description
(3)
Event
A508 Roade Bypass
From the roundabout junction between the A508 Roade Bypass and Northampton Road to a point 140 metres west of that junction; the centreline of which is shown coloured light blue between points V and W as shown on the speed limit plans (Document 2.7B).
Completion of Works No. 13
A508 Roade Bypass
From a point 140 metres north of the roundabout junction between the A508 Roade Bypass and Blisworth Road (Parish of Roade) to that junction; the centreline of which is shown coloured light blue between points X and Y as shown on the speed limit plans (Document 2.7C).
Completion of Works No. 13
A508 Roade Bypass and Blisworth Road roundabout
The circulatory carriageway of the roundabout junction between the Roade Bypass and Blisworth Road (Parish of Roade); the centreline of which is shown coloured light blue between points Y, Z, AA, AB and returning to Y as shown on the speed limit plans (Document 2.7C).
Completion of Works No. 13
A508 Roade Bypass
From a point 140 metres south of the roundabout junction between the A508 Roade Bypass and Blisworth Road (Parish of Roade) to that junction; the centreline of which is shown coloured light blue between points AA and AD as shown on the speed limit plans (Document 2.7C).
Completion of Works No. 13
Blisworth Road (Parish of Roade)
From a point 140 metres west of the roundabout junction between the Roade Bypass and Blisworth Road (Parish of Roade) to that junction; the centreline of which is shown coloured light blue between points AB and AC as shown on the speed limit plans (Document 2.7C).
Completion of Works No. 13
A508 Roade Bypass
From a point 140 metres north of the roundabout junction between the A508 Roade Bypass and Northampton Road to that junction; the centreline of which is shown coloured light blue between points AE and AF as shown on the speed limit plans (Document 2.7C).
Completion of Works No. 13

---
Source: https://www.legislation.gov.uk/uksi/2019/1358/schedule/8/part/3 (the official version)
Page: https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-8/part-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.