# The Northampton Gateway Rail Freight Interchange Order 2019, Part 4: TEMPORARY SPEED LIMITS

Extent: E+W+S

(1)
Location
(2)
Temporary limit to be imposed
(3)
Description
(4)
Duration
A45 Northbound
50mph
From a point 20 metres north of the roundabout junction with the M1 to a point 300 metres before the start of the diverge to the Wootton Interchange.
From commencement of Works No. 8 until completion of Works No. 8
A45 Southbound
50mph
From the diverge at the Wootton Interchange to a point 110 metres north of the roundabout junction with the M1.
From commencement of Works No. 8 until completion of Works No. 8
A508
40mph
From a point 30 metres north of the junction between the A508 and the unnamed road to Quinton to the circulatory carriageway at M1 Junction 15.
From commencement of any of Works Nos. 1 to 6 until completion of Works No. 7
A508
30mph
From a point 68 metres south of the junction between the A508 and Field View to a point 500 metres south of the junction between the A508 and the C26 Ashton Road.
From commencement of Works No. 14 until completion of Works No. 14
A508
30mph
From a point 400 metres north of the junction between the A508 and the C85 Pury Road to a point 250 metres south of that junction.
From commencement of Works No. 14 until completion of Works No. 14
M1 Northbound
50mph
From a point 1 kilometre before the start of the diverge to junction 15 to a point 50 metres south of overbridge at junction 15.
From commencement of Works No. 8 until completion of Works No. 8
M1 Southbound
50mph
From a point 1 kilometre before the start of the diverge to junction 15 to a point 170 metres north of the end of the merge at junction 15.
From commencement of Works No. 8 until completion of Works No. 8

---
Source: https://www.legislation.gov.uk/uksi/2019/1358/schedule/8/part/4 (the official version)
Page: https://openlegislation.uk/northampton-gateway-rail-freight-interchange-order-2019/schedule-8/part-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.