# The Northumberland Line Order 2022, Paragraph 26


In this Part of this Schedule—
“construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;
“the engineer” means an engineer appointed by Nexus for the purposes of this Order;
“Nexus” means the Tyne & Wear Passenger Transport Executive;
“plans” includes sections, designs, design data, software, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes, monitoring schemes and details of the extent, timing and duration of any proposed occupation of railway property;
“protective works” means any works specified by the engineer under paragraph 29(4);
“railway operational procedures” means procedures specified under any access agreement (as defined in the Railways Act 1993) or station lease;
“railway property” means any railway belonging to Nexus and—
(a) any station, land, works, apparatus and equipment belonging to Nexus or connected with any such railway; and
(b) any easement or other property interest held or used by Nexus for or connected with the purposes of such railway or works, apparatus or equipment; and
“specified work” means so much of any of the development as is, or is to be, situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property.

---
Source: https://www.legislation.gov.uk/uksi/2022/820/schedule/10/paragraph/26 (the official version)
Page: https://openlegislation.uk/northumberland-line-order-2022/schedule-10/paragraph-26
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.