# The Oaklands Farm Solar Park Order 2025, Part 1: REMOVAL OF IMPORTANT HEDGEROWS

Extent: E+W

(1) Plan(2) Important Hedgerow(3) Work
Figure 2.09b of the Important Hedgerows PlanH25Removal of 5m of hedgerow H25 at the north of field F1 within the underground cable corridor
Figure 2.09b of the Important Hedgerows PlanH28Removal of 5m of hedgerow H28 along Rosliston Road for the temporary access track
Figure 2.09b of the Important Hedgerows PlanH89 northRemoval of 5m of hedgerow H28 along Rosliston Road for the temporary access track
Figure 2.09b of the Important Hedgerows PlanH87Removal of 5m of hedgerow H87 within field O24 for the underground cable corridor
Figure 2.09c of the Important Hedgerows PlanH66 Removal of 10 linear meters
of hedgerow in the north east of field O19 may be necessary to widen the existing field access
Figure 2.09c of the Important Hedgerows PlanH45 Removal of 5m section
of hedgerow H45 to the east of field O12 within the underground cable corridor
Figure 2.09c of the Important Hedgerows PlanH44 eastRemoval of 6m of hedgerow for a construction access track
Figure 2.09c of the Important Hedgerows PlanH70 Removal of 3.5m section
of hedgerow H70 to the south of field O9, for a temporary access track
Figure 2.09c of the Important Hedgerows PlanH89 south Removal of 3.5m section
of hedgerow H89 south in the south west of field O9, to accommodate a minor track realignment
Figure 2.09c of the Important Hedgerows PlanH79 Removal of 3.5m Existing gap in hedgerow to be
utilised with some widening
being required
Figure 2.09c of the Important Hedgerows PlanH53 Removal of 3.5m Existing gap in hedgerow to be
utilised with some widening being required
Figure 2.09c of the Important Hedgerows PlanH41 northRemoval of 60m of H41 along Coton Road within the required visibility splay
Figure 2.09c of the Important Hedgerows PlanH50 northRemoval of 120m of H50 along Coton Road within the required visibility splay

---
Source: https://www.legislation.gov.uk/uksi/2025/739/schedule/9/part/1 (the official version)
Page: https://openlegislation.uk/oaklands-farm-solar-park-order-2025/schedule-9/part-1/enacted
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.