Regulation 3 Application
Within territorial waters these Regulations shall apply to—
any installation and any activity on it;
any activity, including diving operations, in connection with an installation, or any activity which is immediately preparatory thereto, whether carried on from the installation itself, on or from a vessel or in any other manner, other than—
transporting, towing or navigating the installation; and
any activity on or from a vessel being used as a stand-by vessel;
diving operations involving the survey and preparation of the sea bed for an installation;
subject to sub-paragraph (e), a well and any activity in connection with it and an activity which is immediately preparatory to any such activity;
sub-paragraph (d) includes keeping a vessel on station for the purpose of working on a well but otherwise does not include navigation or an activity connected with navigation; and
any pipeline;
any pipeline works;
the following activities in connection with pipeline works—
the loading, unloading, fuelling or provisioning of a vessel;
the loading, unloading, fuelling, repair and maintenance of an aircraft on a vessel,
being in either case a vessel which is engaged in pipeline works.
Regulations 4 to 22 shall not apply in relation to an installation which is in transit to or from a station; and an installation is not in transit to or from a station while it is being manoeuvred at the station.