# The Offshore Installations (Safety Zones) (No. 2)Order 2002

S.I. 2002/2467 · made 24 September 2002

This order establishes, under section 22 of the Petroleum Act 1987, safety zones having a radius of 500 metres from the specified point around each installation specified in the Schedule to this order and stationed in waters to which section 21(7) of that Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c. 29)) (article 2).

Made under: Petroleum Act 1987 (Section 22, Section 24)

PDFs: Printed copy https://openlegislation.uk/offshore-installations-safety-zones-no-2order-2002/pdf/uksi_20022467_en.pdf

## Introductory text

OFFSHORE INSTALLATIONS
Made 24th September 2002
Coming into force 21st October 2002
The Secretary of State, in exercise of the powers conferred on him by section 22(1) and (2) of the Petroleum Act 1987 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and for the purpose of giving effect to proposals submitted to him by the Health and Safety Commission under section 24(2A) of the Act, hereby makes the following order:

## 1 Citation and commencement

This order may be cited as the Offshore Installations (Safety Zones) (No. 2) Order 2002 and shall come into force on 21st October 2002.

## 2 Establishment of safety zones

A safety zone is hereby established around each installation specified in column 1 of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.

## 3 Removal of safety zone

In Schedule 1 to the Offshore Installations (Safety Zones) Order 1997, the entry relating to Moira Wellhead is deleted.

## Signature

Signed by authority of the Secretary of State
Nick Brown
Minister of State,
Department for Work and Pensions
24th September 2002

## SAFETY ZONES

(1)
(2)
(3)
Name or other designation of the offshore installation
Latitude North
Longitude
Caledonia Wellhead, Block 16/26, Caledonia Field
58° 6.17'
01° 8.67' E
Madoes Production Manifold, Block 22/23b, ETAP Field
57° 10.13'
01° 26.02' E
Mirren East Production Well, Block 22/25b, ETAP Field
57° 18.5'
00° 54.66' E
Mirren West Production Well, Block 22/25b, ETAP Field
57° 18.06'
01° 52.04' E
Galley G6 Well and Tree, Block 15/23a, Galley Field
58° 15.75'
00° 31.06' E
DC3 Manifold, Block 21/24, Guillemot West−Western Extension Project
57° 10.18'
00° 41.15' E
Well 21/24 T1Z, Block 21/24, Guillemot West−Western Extension Project
57° 10.16'
00° 41.14' E
Well 21/24 T2Y, Block 21/24, Guillemot West−Western Extension Project
57° 10.21'
00° 41.14' E
Maclure Subsea Tree, Block 9/19, Maclure Field
59° 22.101'
01° 36.386' E
Drill Centre 2 (DC2), Block 211/13a, Penguins Field
61° 37.783'
01° 29.779' E
Drill Centre 3 (DC3), Block 211/13a, Penguins Field
61° 36.479'
01° 32.888' E
Drill Centre 4 (DC4), Block 211/13a, Penguins Field
61° 33.889'
01° 36.411' E
Drill Centre 5 (DC5), Block 211/13a, Penguins Field
61° 31.825'
01° 39.631' E
Scoter Drill Centre, Block 22/30a, Scoter Field
57° 08.085'
01° 59.388' E
Claw Drill Centre, Block 204/20, Shiehallion Field
60° 21.108'
04° 10.863' W
Tullich North, Block 9/23a, Tullich Field
59° 19.040'
01° 33.284' E
Tullich South, Block 9/23a, Tullich Field
59° 18.528'
01° 34.531' E
Wells WH1 and WH2, Block 42/28b, Whittle Field
54° 06.618'
00° 32.578' E
Wollaston Well, Block 42/28a, Wollaston Field
54° 06.865'
00° 27.686' E

## Explanatory note

(This note is not part of the order)
This order establishes, under section 22 of the Petroleum Act 1987, safety zones having a radius of 500 metres from the specified point around each installation specified in the Schedule to this order and stationed in waters to which section 21(7) of that Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c. 29)) (article 2).
Vessels, which for this purpose include hovercraft, submersible apparatus and installations in transit, are prohibited from entering or remaining in a safety zone except with the consent of the Health and Safety Executive or in accordance with regulations made under section 23(1) of the Act (currently the Offshore Installations (Safety Zones) Regulations 1987/1331).
This order removes the safety zone around Moira Wellhead by deleting the entry relating to it in Schedule 1 to the Offshore Installations (Safety Zones) Order 1997/735 (article 3).

---
Source: https://www.legislation.gov.uk/uksi/2002/2467 (the official version)
Page: https://openlegislation.uk/offshore-installations-safety-zones-no-2order-2002
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

