# The Offshore Installations (Safety Zones) Order 2003, Article 3: Amendment of the Offshore Installations (Safety Zones) (No. 2) Order 2002


In the Schedule to the Offshore Installations (Safety Zones) (No. 2) Order 2002—
(a) in the entry relating to Madoes Production Manifold, for “01° 26.02− E” in column 3 there shall be substituted “01° 26.21− E”;
(b) in the entry relating to Mirren East Production Well—
(i) for “57° 18.5−” in column 2 there shall be substituted “57° 18.51−”; and
(ii) for “00° 54.66− E” in column 3 there shall be substituted “01° 54.66− E”;
(c) in the entry relating to Mirren West Production Well—
(i) for “57° 18.06−” in column 2 there shall be substituted “57° 18.65−”; and
(ii) for “01° 52.04− E” in column 3 there shall be substituted “01° 52.42− E”;
(d) in the entry relating to Galley G6 Well and Tree, for “00° 31.06− E” in column 3 there shall be substituted “00° 31.61− E”;
(e) in the entry relating to Drill Centre 4 (DC4), for “Block 211/13a” in column 1 there shall be substituted “Block 211/14”; and
(f) in the entry relating to Drill Centre 5 (DC5), for “Block 211/13a” in column 1 there shall be substituted “Block 211/14”.

---
Source: https://www.legislation.gov.uk/uksi/2003/845/article/3 (the official version)
Page: https://openlegislation.uk/offshore-installations-safety-zones-order-2003/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

